Supply And Laying Of 4 Core 150 Sq Mm Aluminium Armoured Cable From Power Feeder Pillars Of Both Ends Of The Median Verge To 04 Four Nos Pylon Of The Vidyasagar Setu Under Hrbc. Hrbc/jpme/nit/09/25-26
Construction Of New 2-pump Fire Station G1 Storeyed Building Having Foundation Of G3 Storeyed Building At Gazole,
Construction Of New 2-pump Fire Station G 1 Storeyed Building Having Foundation Of G3 Storeyed Building At Nonadanga
Supply, Installation, Testing And Commissioning Of Audio Video Conferencing System At The Conference Hall, 2nd Floor Of Hooghly River Bridge Commissioners
Construction Of New 2-pump Fire Station G1 Storeyed Building Having Foundation Of G3 Storeyed Building At Gazole, In The District Of Malda, West Bengal. Hrbc/02/dirpldn/2025-2026
Supply, Installation, Testing And Commissioning Of Audio Video Conferencing System At The Conference Hall, 2nd Floor Of Hooghly River Bridge Commissioners. Hrbc/jpme/niq/11/25-26
Construction Of New 2-pump Fire Station G 1 Storeyed Building Having Foundation Of G3 Storeyed Building At Nonadanga In The District Of Kolkata, West Bengal. Hrbc/02/dirpldn/2025-2026
Emergent Repairing Of Damaged Bituminous Surface At Up Carriageway On Howrah Viaduct Hv-26- Hv-28 Of Vidyasagar Setu. Hrbc/jpmw/kr/7/25-26
Cleaning The Carriageways, Median Verges, Footpaths Of Howrah Viaduct Main Bridge To Toll Plaza Building Both Ways Of Vidyasagar Setu For The Year 2025-2026. 2nd Call Ref- Hrbc-pmw-kr-4-25-26 Hrbc/jpmw/kr/7/25-26
Emergent Repairing Works Of Existing Loop Boxes, Including Supply And Laying Of New Cables In Place Of Damages Cables Of Different Poles At Nager Bazer Flyover Under Hooghly River Bridge Commissioners Hrbc/jpme/nit/07/25-26