Construction Of Path After Exit Gate Towards Seven Spring
Fabrication And Installation Of An Extension Steel Platform At The Upper Terminal Point Utp Of Makhdoom Sahib Ropeway Project. Fabrication And Installation Of An Extension Steel Platform At The Upper Terminal Point Utp Of Makhdoom Sahib Ropeway Project
Construction Of Path At Pre Exit Gate Dhaba Side
Consolidation Of Abutment Of Bridge Near Souvenir Shop At Gulmarg.
Consolidation Of Abutment Of Bridge Near Souvenir Shop At Gulmarg.
Construction / Repairs Of Stairs At Gulmarg Gondola Project Near Atm.
Construction / Repairs Of Stairs At Gulmarg Gondola Project Near Atm.
Installation Of Fencing At De-boarding Side At G1 Station Of Gulmarg.
Construction Of Path At Queuing Area To Onwards At Kongdori
Repair / Renovation Of Lane / Drain On De-boarding Side At G1 Station Of Gulmarg.