Excavation For Foundation / Pipe Trenches In Hard Rock By Blasting Including Removing The Excavated Material Upto A Distace Of 50 M And Lifts As Below, Stacking And Spreading As Directed By Engineer-in-charge, Normal Dewatering, Preparing The Bed Etc.complete. Lift 6.00 M To 7.50 M Piped Water Supply Scheme At- Injiwali Tal- Karjat
For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 916351913337 .