Construction Of Robs In Lieu Of Following Level Crossings Of Bza Division. A Kondapalli-vijayawada Section: Construction Of Proposed Two Lane R.o.b In Lieu Of Lc.no.147 At Rly Km.573/17-19 Proposed At Rly Km.573/15-17 Between Kondapalli &rayanapadu Stations, Bridge Proper : 1 X 72.0m Bow String Girder Approaches : Span 4 X30.0m Psc Girder + 1 X 18.30 M Composite Girder On Elaprolu Side + 1x18.0 M Composite Girder+7x30.00 M Psc Girderon Guntupalli Road Side Approach Roads With Reinforced Earthen Walls On Both Sides. B Construction Of Proposed Two Lane R.o.b At Rly Km 570/31-33 In Lieu Of Lc.no.148 At Rly Km.575/09-11 Between Rayanapadu & Vijayawada Stations .bridge Proper : 1 X 54.0m Bow String Girder Approaches : Span 5 X 30.0m Psc Girder + 1 X 18.00 M Composite Girder On Paidurupadu Side + 1x18.0 M Composite Girder+5x30.00 M Psc Girderon Vijayawada Road Side Approach Roads With Reinforced Earthen Walls On Both Sides. C Vijayawada-visakhapatnam Section :construction Of Proposed Two Lane R.o.b At Rly Km 434/29-33 In Lieu Of Lc.no.316 At Rly Km.439/31-33 Between Vijayawada & Gunadala Stations.bridge Proper : 1x48.00m Bowstring Girder+1 X 72.0m Bow String Girder + 1 X18.0m Composite Girder & Approaches : Span 6 X 30.0m Psc Girder On Nunna Side + 7 X 30.0m Psc Girderon Karmel Nagar Side Approach Roads With Reinforced Earthen Walls On Both Sides.
For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 916351913337 .