Sh- Extension Of Hume Pipe Culvert With Catchpit And Toe Wall, Culvert Approaches At Rd 1/500 And R/wall 1/615 To 1620deposit Work Restoration Of Rain Damage On Link Road Bhor Balli To Bohar Kawaloo Km. 0/000 To 6/000
Construction Of Rcc Boundary Wall To Prevent Encroachment At Tanakpur Yard, Its Approaches And At Various Locations In Aden Pbe Section Of Izn Division.
A Itarsi - Bhopal Section : Construction Of Shed Over Approaches Of Lhs At Lhs 225 Garibi Line At Itarsi- Bhopal Section And Lhss No 206, 217, 219 & 209 At Khandwa-Itarsi Total 4 Lhs, B Fixing Of Height Gauge At Lc 213, Lhs-214, Lhs- 210, Mehragaon Rub No. 743/1 Total 4 Nos, Construction Of Pump Room At 214, 220, 217, 219, 209 & 229 Total 6 Nos And Other Work I.E. Drain, Fencing Around Sump Etc.
Guntakal Division-Sw:I Proposed Construction Of Boundary Wall Near Station Approaches 2000M At Ru And 600M At Vki Under Aden/Ru Jurisdiction. Sw:Ii Repaires To Compound Wall & Roof Over Roofs Of Staff Quarters At Ru & Vki In Aden/Ru Sub Division.
Construction Of Rob With 1X36 Mtr Composite Girder + 2X18 Mtr Composite Girder + 6X24.0 Mtr Rcc T- Beam Girder, Including Bridge Approaches With Re Walls In Lieu Of Existing Manned Lc- 387 At Km: 696/17-19 Between Pundi-Naupada Stations Of Waltair Division In East Coast Railway.
Sopd G 25 26 40 Construction Of Spt Bridge Including Approaches At Tamargaon Over Mora Subansiri Under Sopd-g For The Year 2024-25
Please Refer To Boq. Construction Of 20 Mtr Span Single Lane Steel Plate Girder Motorable Bridge With 1.2 M Wide Foot Path On Both Sides, Including Approaches At Madarsa Qasim Ul Uloom Seri Khawaja. Under Ut Capex Budget 2025-26
Construction Of 30 Mtr Span Foot Bridge Over Lohara Khad For Government Senior Secondary School Lohara Including Approaches Tehsil Amb District Una Hp
Rtm Division-Execution Of Various Work As Under- 1.Chintamanganesh-Ujjain Section :- Providing Boundary Wall In Station Approaches & Along Track Side Total 5.2Km In Connection Simhastha 2028. 2. Ujjain - Shipra Bridge Section :- Providing Boundary Wall In Station Approaches & Along Trackside To Prevent Encroachment And Theft. Total 5100 Rm In Connection Simhastha 2028. 3. Naikhedi - Mohan Pura Section :- Providing Boundary Wall In Station Approaches & Along Track Side To Prevent Encroachment And Theft. Total 3.0 Kmin Connection Simhastha 2028. 4. Mohan Pura -Shipra Bridge Section :- Providing Boundary Wall In Station Approaches & Along Track Side To Prevent Encroachment And Theft Total 5.21 Km In Connection Simhastha 2028. 5. Ujjain - Pawasa Section :- Providing Boundary Wall In Station Approaches & Along Track Side Total 5.35 Km In Connection Simhastha 2028.
A Miscellaneous P-Way Works Including Bg Track Linking, Turnouts And Sej Installation, In-Situ Fabrication And Assembly Of Glued Joints, Dismantling Of Existing Track And Turnouts, Ballast Supply And Spreading, Leading Of P-Way Materials, At Welding, And Other Ancillary Activities For Converting Achalganj Halt Into Crossing Station On The Unnao-Bighapur Section. B Miscellaneous Balance P- Way Works Including Bg Track Linking, Turnouts And Sej Installation, In-Situ Fabrication And Assembly Of Glued Joints, Dismantling Of Existing Track And Turnouts, Leading Of P-Way Materials, At Welding And Other Ancillary Activities At Malhaur & Barabanki Station Yard /Approaches In Connection With Barabanki- Malhaur 3Rd And 4Th Line Under Dy Ce/C-Iv/Lko, Lucknow Division, Northern Railway.