Crane, Bagasse Elevator-Inspection-Testing Certificate Crane, Bagasse Elevator-Inspection-Testing Certificate/7442/1993/Lwo
Design, Manufacturing And Supply Of Rake For Bagasse Rake Elevator And Magasse Rake Elevator For Mill Section At Hbl Plant Lauriya, West Champaran, Bihar.
Supply Of Spares For Bagasse Elevator Chain Link
Bagasse Elevator Chain Spares
Bagasse Elevator Chain
Purchase Of Cane Carrier Shaft With Sprockets, Mrc Shaft With Sprockets, Belt Conveyor Drive And Non Drive Pulley, Irc Shaft With Sprocket, Bc-01 Belt Conveyor Drive And Non Drive Pulley, Bagasse Elevator And Main Bagasse Carrier Shaft
Misc. Fabrication And Erection Works -Dismantling Of C.I. Feeding Chute Of 20 Ton Boiler & Fitting Of Ci Mouth-Piece/ Chute Complete Work , Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 40/30/20 Ton Boiler , Dismantling Fabrication & Fitting Of Complete New Casing Of Id Fan With Cone Of Boiler. For 40 Ton Boiler, Fabrication & Erection Of Runner Supporting Box Below At Old Mbc/New Mbc/Cross Carrier/ Bagasse Elevator., Replacement Of Worn Out Bottom & Side Plate Of Bagasse Carrier/ Bagasse/Elevator/ Cross Carrier/ Rbc/Irc By Ms/Ss Plates, Replacement Of Worn-Out Ducting Dampers Of I.D./ Fd Fan, And Other Ducting With Levers And Bushes, Replacement Of Worn-Out Ducting Of Flue Gas Fabrication & Fitting Of Bagasse/Ash Chute For New & Old Boilers
Supply Of Bagasse/Mud/Mill/Sugar Elevator Belt
Fabrication Erection Dismelting Work Of Pipe And Machinery -Replacement Of Worn Runners Of Cane Carrier, Bagasse Carrier And Bagasse Elevator., Removing The Angles On Both Sides Of The Cane Carrier And Installing New Angles., Removing And Straightening The Crooked Girder Of The Cane Carrier Pit And Successfully Giving The Trial., Cutting Out The Damaged Knife Of A Cane Kicker And Replacing It With A New Knife And Balding., Removing The Old Hood Of Cane Cutter And Making A New One From 10/12 Mm Plate And Giving Satisfactory Fit., Cutting Out The Melted Side Plate Of The Can Carrier And Replacing It With A New/Old Plate., Removing The Old Corroded Tray Of The Mill House, Making It From 6/8 Mm New/Old Plate And Giving A Satisfactory Trial., Balding And Grinding Of Count Pinion Of Mill House According To Size.
Fabrication Erection Dismelting Work Of Pipe And Machinery -Replacement Of Worn Runners Of Cane Carrier, Bagasse Carrier And Bagasse Elevator., Removing The Angles On Both Sides Of The Cane Carrier And Installing New Angles., Removing And Straightening The Crooked Girder Of The Cane Carrier Pit And Successfully Giving The Trial., Cutting Out The Damaged Knife Of A Cane Kicker And Replacing It With A New Knife And Balding., Removing The Old Hood Of Cane Cutter And Making A New One From 10/12 Mm Plate And Giving Satisfactory Fit., Cutting Out The Melted Side Plate Of The Can Carrier And Replacing It With A New/Old Plate., Removing The Old Corroded Tray Of The Mill House, Making It From 6/8 Mm New/Old Plate And Giving A Satisfactory Trial., Balding And Grinding Of Count Pinion Of Mill House According To Size.