Strengthening Weak Side Slope By Construction Of Toe Wall Murom Filling, Boulder Pitching, Preparing Sub-Bank Dressing Of Bank By 2:1 Slope For Approaches Of Bridge No 552/1, 552/2, 557/3, 557/4 & 557/5 Total 1000*2 2000M In Kui-Wd Section.
Providing And Laying Of Boulder And Stone Crated Studs Along With Boulder Stone Apron And Pitching On Sagrapara Near Village Sagra At Save Nearby Abadies And Agriculture Land Sagra
Boulder Pitching Against Upgradation Of Avm D/s Slope From Km. 0.480 To Km. 0.510 Of By-aflex Bund In U/s Of Sharda Barrage Banbasa
Due To Boulder Pitching Against Km. 1.130 To Km. 1.160 Of By Aflex Bund In U/s Of Sharda Barrage Banbasa
Chanchal Kharba Churaman Ghat Road From 11 Point 50 Kmp To 12 Point 50 Kmp Restoration Work By Boulder Sausage Stone Pitching And Chute Drain Under Malda Highway Division In The District Of Malda During The Year 2025 2026
Construction Of Toe Wall, Boulder Pitching On Slope For Protection Of Canal Compound Including All Material, Labour And T And P Required For Proper Completion Of Work At Head Of New Mahoi Pump Canal Tehsil Madhogarh
Construction Of Slope Boulder Pitching And Launching Apron In Left Bank Of Pahuj River Including All Material, Labour And T And P Required For Proper Completion Of Work At Head Of New Mahoi Pump Canal, Tehsil- Madhaugarh
Construction Of Toe Wall, Boulder Pitching On Slope For Protection Of Canal Compound Including All Material, Labour And T And P Required For Proper Completion Of Work At Head Of New Mahoi Pump Canal Tehsil Madhogarh
Development Work Of Pond Plot No. 279 Area 0.870 Hectare Located In Mohalla Palhari In Ward-banwa Palhari Within The Limits Of Nagar Palika. Work Of Cleaning, Dewatering, Desilting, Boulder Pitching, Stairs, Fencing, Fountain Etc.
Development Work Of Ghasi Ram Pond Located In Mohalla Rahat Nagar In Ward-banwa Palhari Under The Limits Of Nagar Palika. Work Of Cleaning, Dewatering, Desilting, Boulder Pitching, Stairs, Fencing, Fountain Etc.