Installation, Testing And Commissioning Of Ballastless Track Including Supply Of Buffer Stop For 2.2 T-km Of Line -11 At Saket -g Metro Station, 3.3 T-km Of Line-10 At Sarita Vihar Depot And 0.3 T-km At Noida Electronic City Metro Station Of Line -3.
Supply of Lateral Buffer Lateral Bump Stop For T-18 Bogie, Icf Drg.No. 89005003 Alt.B, Item No. 13, Gmt Drg.No. 62093601 For 3 Phase Icf Underslung Memu. Warranty Period: 30 Months After Th E Date Of Delivery
Installation, Testing And Commissioning Of Ballastless Track Including Supply Of Mss And Buffer Stop
Installation Of Ballastless Track Including Supply Of Buffer Stop And Others For Priority Corridor Malahi Pakhri
Supply of Primary Rubber Washer, Oem: Trp Zelc Part Number:Db00001131g00 Car Builder: Cr Rc Zelc Primary Vertical Stop, Oem: Trp Zelc Part Number: Db00002205g00 Car Builder: Crr C Zelc Rotary Arm Positioning Rubber Joint, Oem: Trp Zelc Part Number: Db00001308g00 Ca R Builder: Crrc Zelc Traction Rubber Articulation, Oem: Trp Zelc Part Number: Db00001131g00 Car Builde R: Crrc Zelc Lateral Stop And Buffer, Oem: Trp Zelc Part Number: Db00002201g00 Car Builder: C Rrc Zelc Motor And Gearbox Suspension, Oem: Trp Zelc Part Number: 800069901742 Car Buil Der: Crrc Zelc
Supply of Stop Buffer 172.18. 055-1 Hinge 172.11. 030-1
Procurement Of Friction Buffer Stops For Sumber And Khari Station Yards Of Dharam-Banihal Section Of Udhampur-Srinagar- Baramulla Rail Link Usbrl Project. Friction Buffer Stop
Installation, Testing And Commissioning Of Ballastless Track Including Supply Of Mss And Buffer Stop For Line - 10 Aerocity To Tughlakabad Ch. -760M To Ch. 23286M.
Supply of Primary Bump Stop/Rubber Buffer As Per Drg. No. 1227081 Rev-04R2 Mat. Spec:-T.S. 17.53110003, T.S. 17.617 100 02, Mdts-148 Rev. - 01 & Mdts -122 Rev. -03 Or Latest Warranty Period: 30 Months After The Date Of Delivery
Supply of Primary Bump Stop/Rubber Buffer As Per Drg. No. 1227081 Rev-04R2 As Per Drg.No. Rcf/Lw01102, Alt-D.