Reconstruction Of Centre Median And Beautification Work At Balasundaram Main Road From North Zonal Office To South In Ward No.49 In Central Zone.
New Construction For Road Centre Median At Avinashi Road To Balan Nagar Arch In Ward No 52 In East Zone
El.D.C.No.South/4287/2025 Supply And Laying Of 1333 Mtrs Of 3 1/2 X 25/120 Sqmm Alu Ug Cable At Radial Road Centre Median Narayanapuram Reach 3 In Division 189 Zone 14
El.D.C.No.South/4286/2025 Supply And Laying Of 1530 Mtrs Of 3 1/2 X25 Sqmm Alu Ug Cable At Radial Road Centre Median Narayanapuram Reach 2 In Division 189 Zone 14
El.D.C.No.South/4285/2025 Supply And Laying Of 1556 Mtrs Of 3 1/2 X25 Sqmm Alu Ug Cable At Radial Road Centre Median Narayanapuram Reach 1 In Division 189 Zone 14
Widening From Two Lane To Four Lane And Strengthening In Km 7 2 . 8 2 Of Poonamalle Kundrathur Pallavaram Road Including Construction Of Minor Bridge Storm Water Drain And Centre Median Tn.57/Sl.No.01/Ccr-I /Cmrdp Work 2025-26
Repairs To Existing Centre Median At Thyagaraya Road From Anna Salai To Junction Of South Boag Roadin Div 117 Unit 26 Zone 09
Providing Of Bt Patches, Renewal And Centre Median Kerb Wall Painting, Road Line Marking, Studs For The Visakha Valley School Road And Beach Road From Khailasagiri Rope Way To Seetha Konda In Ward No. 09 Of Zone-ii, Gvmc For The Partnership Summit 2025
Beautification Of Centre Median At Velachery Perungudi Mrts Railway Road In Div 177 178 Unit 39 Zone 13
Wdg From 2L To 4L 3Lto 4L And Steg Of Erode Dharapuram Road Incl Realignment And Constn Of Bridge Wdg Of Minor Bridge At Km 32By4 Wdg, Constn And Reconstn Of Culverts Rtg Wall Providing Centre Median Paver Block Junction Impts And Inclla Sh83a Tpr068 Tn 31 25 26 Tirupur Division Tpr 068