Korle Satandi Medium Irrigation Project Tal Devgad Dist Sindhudurg Construction Of Left And Right Side Protection Wall And Plugging Wall Near Waste Weir, Construction Of Remaining Work Of Tail Channel Construction Of Road From Tail Channel Bridge
Constt Of Field Channel And Land Development Work At Command Area Under Lamochan Youlboo Irrigartion Canal
Providing Consultancy Services For Survey Work For Tail Channel Surrounding And Countor Survey Of Demi 2 Irrigation Scheme.
Construction Of Balance Work Of Tail Channel From Ch.500 M To 625 M Under Vaitarna Mukane Diversion Scheme, Tal. Igatpuri Dist. Nashik.
Restoration Of Washed Away Right Side Crate Work Of Supply Channel Of Sofi Khul At Offtake Point
Improvement Works To Drainage Channel With Structure Work Improvement To Link Drains Out Falling To Chitei And Guasul Nallah With Construction Of Structure In Bhograi Block Of Balasore District
Improvement Works To Drainage Channel With Structure Work Improvement To Panchupali Nallah System Under Baliapal Block Of Balasore District Under Doab No. Ix
Improvement Works To Drainage Channel With Structural Work Improvement To L/D Of Nampo-Banida Nallah Near Village Nampo And Ikidaa In Jaleswar Block Of Balasore District.
Geo-Technical Investigation Soil Exploration For The Proposed Work Improvement To Drainage Channel From Badaharipur To Beguniajore And Its Link Drains, Dakeswari Nalla And Its Link Drains With Structures In Chandbali Block Of Bhadrak District Under Doab No-Xii.
Construction Of Field Channel At Various Work Sites In Different Villages Spread Over In Sangerwani-Gadder Border And Hilly Karewas Construction Of Field Channel At Various Work Sites In Different Villages Spread Over In Sangerwani-Gadder Border Area And Hilly Karewas Cad Sub-Division Pulwama.