Channelization With Gabion Boxes Work At Loran Nallah Near Baldev Sharma House, Ward 07.
Channelization With Gabion Boxes Work At Shastrinagar Nallah Opposite Reliance Store, Ward 11.
Channelization Of Drain For Rain Water Sh P L Dwe Pipe 250Mm Dia And P L Interlocking Paver Blocks From Pankaj Kiryana To Adv. Rajeev Gill House In Ward No.14
Flood Protection And Training Work At Nimoo Nallah By Way Of Channelization, Earth Work And Construction Of Gabion Wall Rd0-700 L 700 Mtr.at Stabgyat.
Construction Of Crate Revetment And Embankment Between Rd 15600-15780m Near N. S. Pura, Restructuring/ Strengthening Of Crate Revetment Between Rd 15900-16000m, Channelization Of Creek For Diversion Of Water In Front Of Rd 16050-16400m And Raising/ R Construction Of Protection Works On Critical Spots Downstream Steel Bridge Akhnoor To Hamirpur On Both Banks Of River Chenab
Same As Above Development Of Head Works/channelization To Intake For Various Water Supply Schemes Of Phe Sub Division For The Year 2025-26
Construction Of Channelization Of Nallah Near H/o Sh. Ram Singh And Sanjay Sharma In Ward No. 7
Construction Of Channelization Of Nallah Near H/o Sh. Sukhdev In Ward No. 1
Channelization Of Beas River Near Diversion Tunnel Down Stream Of Pandoh Dam
Strengthening Of Strata And Ground Improvement Works Including Channelization Of Leakage Water Flowing Out From Hrt Of Mb-Ii Hep At Gamri Gad, Distt-Uttarkashi.