Ktps-vi Stage -bm- Replacement Of Gravimetric Feeder Transition Chutes In Bm Division/ktps Vi Stage During The Annual Overhaul Period For The Year 2025-26.
Fabrication Supply And Erection Of Receiving Chutes With Skirt Board Assembly For Conveyors 58A And 58B
Restoration Of Damaged Chutes And Side Drain At Inspection Bank In Between Rd 35500 M To Rd 34655 M On B/s Mhc-i During The Year 2025-26
Restoration Of Damaged Chutes And Side Drain At Inspection Bank In Between Rd 10643 M To Rd 12976 M On L.h.s. Of Mhc-i During The Year 2025-26
Brick On Edge Soling Work At Service Road Left Bank And Construction Of Rainwater Chutes On Left Bank And Right Bank Between Km. 70.000 To 80.000 Of Rapti Main Canal
Erection Of Reconditioned/fabricated Dummy Ms Plates And Ss Liner Plates To The Hitting Areas Of Discharge Chutes, Patch Welding For The Conveyor Chutes Of Bcn-1a/b, 2a/b, Afd-1 And 2 And Connecting Chutes At Tp-1 And Fg-1, 2, 3 And 4 As And When Required In Sec-1 And 2 Mm-i Sub Division Of Mm/chp/btps For The Period From 01.04.2025 Or From The Actual Date Of Commencement Of Work To 31.03.2026.
Gem Bids For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Coal Mines; Cleaning Of Discharge Return Conveyor Chutes Conveyor Belts Conveyor Drums Conveyor Rollers And Brackets Charging Discharging Hoppers Etc Including Jamming D..
Mtps I Mill Plant Unit Iv Reconditioning Of Released Ss Elliptical Feeder Discharge Chutes Released From Unit Ii Unit Iv
Erection Of Reconditioned/fabricated Dummy Ms Plates And Ss Liner Plates To The Hitting Areas Of Discharge Chutes, Patch Welding For The Conveyors Bcn-3a/b And Connecting Chutes At Tp2 And Contingency -1 And 2 Chutes As And When Required In Sec-iii Of Mm-i Sub Division Of Mm/chp/btps For The Period From 01.04.2025 Or From The Actual Date Of Commencement Of Work To 31.03.2026.
Supply Of Hard Wear Plates For Sag Mill Plant And Crusher Chutes