Supply, Installation And Commissioning Of Rake Test Rig, As Per Rdso Sketch No.81110 Of Rdso Pamphlet No. C-8805, The Test Rig Shall Be Capable Of Testing Rakes Of Coaches With Twin Pipe Air Brake System. The Scope Of Supply Shall Consist Of Following Items As Per Rdso Sketch: A Filter- 01 Nos, B Angle Cock - 02 Nos, C Brake Hose Coupling Bp- 02 Nos, D Single Pressure Gauge 6 - 03 Nos, E Drivers Brake Valve - 01 No, F Relay Valve Du-22 :- 01 No, G Feed Valve F-2 :- 01 No, H Isolating Cock - 03 Nos, I Brake Hose Coupling Fp - 01 No, J Equalizing Reservoir 9l - 01 No. Make- Escort, Sswaha, Or Similar.
Supply of Bolster Suspension Hangers Of Main Line Bolster Suspension Hangers Of Main Line & Emu Coaches To Spec. No. C-K 105 Rev.1 To Icf Drg. No. T-0-5-639, Alt.H/11..
Supply Of Suspension Arrangement For 200 Liters Au Suspension Arrangement For 200 Liters Auxiliary Reservoir Of Air Brake Coaches To Icf Drg No. Icf/std- 3-5-008, Alt-c/nil.items 1 To 5. As Per Drg.no. Icf Drg No.icf/std3-5-008, Alt- C/nil.items 1 To 5 As Per Specn. As Per Drawing.
Supply Of Mirror For Coupe Of Nac Lhb Coaches.
Supply Of Emu/memu Motor Coaches, Elgi Make Air Compressor Type Trc-1000dcm, 18 Month Overhauling Kit Each Kit Consist Of 49 Items As Per Annexure..
Supply Of Emu/memu Motor Coaches, Kpc Make Air Compressor Type 3hc-55, 54 Month Overhauling Kit.
Supply Of Emu/memu Motor Coaches, Kpc Make Air Compressor Type 3hc-55, 36 Month Overhauling Kit.
Supply, Installation And Commissioning Of Electro-pneumatic Pressurised Flushing System For 100 Lhb Non-ac/ac Coaches 400 Lavatories At Ferozepur And Jammu Division, As Per Rly. Bulk Rsp 2024-25, Pb Item No. 745/24-25. The Material Shall Be Supplied As Per Specification: Mmdts 19027 Rev- 03 Or Latest And Follow Drg. No. Mi007851 Alt. Nil For Mounting Dimensions Of Control Panel Of Eppfs For Lhb Coaches, Packing & Marking Shall Be Done As Per Mmdts 19027 Rev 03 Or Latest, Warranty Shall Be Applicable As Per Mmdts 19027 Rev- 03 I.e. 30 Months From The Date Of Supply Or 24 Months From The Date Of Placement In Service Whichever Shall Be Sooner Or As Per Latest Irs Conditions.
Supply Of Lower Spring Beam For Ac Coaches..
Supply of Two Piece Glass Shutter For Frp Body Side Window Of Non Ac Lhb Coaches..