Rc Of Coal Bunker And Mill Rejection Bunker Arch Breaking And Cleaning At Unit 5 And 6, Stps As And When Required Basis For Two Years
Providing Labor Assistance For Cleaning Of Jammed /Overloaded Coal At Bunker Floor Conveyors And Tp Belt Feeders And Various Locations Of Mm-Ii Sub-Division/Chpm.M-I & Ii/Dr.Nttps., During Rainy Season For The Financial Year 2025-26.
Nctps Ii 2 X 600 Mw Operation Circle Chemical Division Time Bound Works Sample Collection Steam Water Cycle And Gas Samples Bunker Coal Oil Fly And Bottom Ash Operational And Testing Assistance To Rodm Plant And Express Laboratory And Etp Opera
Supply Erection And Commissioning Of 3d Radar Type Level Transmitter For Coal Bunker Level Transmitters For Ntpc Talcher Adani Raipur And Mirzapur Projects
Rehandling Of The Spilled Coal Of Power Coal Bunker From Grid No-210w/70s To 130w/70s And Clean Coal Bunker From Grid No. 210w/80s To 130w/80s In Post Washery Section At Kedla Washery
Rate Contract For Checking And Repairing Of Coal Bunker Of Unit 5 Btps During Upcoming Overhauling
Work Of Cleaning Of Coal Bunker & Emptying Manually By Entering Inside The Bunkers / Manual Pocking And Removal Of Coal By Digging The Jammed / Stricken Coal In Boiler Unit Nos. 3 To 5 At Gsecl Ukai Tps. Bmd-ii Wt-4986
Work Contract For Picking And Transportation Of Muddy Coal Evacuated From Coal Mills/rcf/coal Bunker And Its Surrounding Area And Transportation To Specified Location For Unit 3 And 4 At 2x660 Mw Units Of Sstpp, Mppgcl, Dongalia.
Providing Additional Structural Support For Conical Portion Of Coal Bunker Hoppers Abcd
Ot 122 Providing Additional Structural Support For Conical Portion Of Coal Bunker Hoppers Efgh