Supply, Installation, Commissioning & Proving Out Of Coil Spring Load Deflection Testing Machine.
Supply Of Airless Centrifugal Shot Blasting Machine For Cleaning And Shot Peeing Of Coil Springs As Per Attached Specification..
Supply Of Tx-rx Coil For Siemens Make Msdac As Per Rdso Specification No- Rdso/spn/176/ 2012 Ver 3.0 Or Latest Each Set Having 1 Rx + 1 Tx Coil.
Supply Of Condenser And Evaporator Coil Assembly In Set.
Supply Of Condenser And Evaporator Coil Assembly.
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Rectification Replacement Of Defective Tubes In Ltsh Coils Economizer Hanger At Boiler Iind Pass Area
Mtps I Bm Unit Iv Boiler Pressure Parts Replacement Of Most Overheated Hot Reheat Coil Rear Side Bend In Boiler Inter Pass Area Circuit No 29 To 48
Ttps Mech Ii Bm Unit Iii Replacement Of Plugged Eroded Economizer Coil Assemblies From Right End To Middle Area In Unit Iii Boiler During Overhaul For The Year 2025 2026
Ttps Mech Ii Bm Unit Iii Replacement Of Eroded Plugged Economizer Coil Assemblies From Left End To Middle Area In Unit Iii Boiler During Overhaul For The Year 2025 2026
Supply Of Hog A & B Control Auxiliary Contactor S2k8 & S2k9 With 24v Dc Coil, Aux 3 No+ 4 Nc. Material Shall Conforming Rdso Specification No. Rdso/ Pe/ Spec/ Tl/0195-2019 Rev-0 Or Latest. Accepted Makes : As Per Rdso Specification No. Rdso/ Pe/ Spec/ Tl/0195-2019 Rev-0 Pg.24, S.no. 15 - Schneider Part No.ca3kn31bd+la1kn04 Or Siemens Part No. 3rh21221bb40+ 3rh2911-1ha22 Or Abb Part No. Nfzb44ert-21 Or L&t Part No. Mo0 Dc Or C&s Electric Part No. Tca3dn22bd+ Ta1dn22. Material Shall Be Procured From Above Said Oem Or Authorized Dealers With Authorization Letter Of Said Oem Only. Supplier Shall Submit Oem Test Certificate Along With Material..