Liining Of Canal For A Length Of 74.5M For Bed And Both Sides Is Proposd In This Estimate. The Provisions Given In The Estimate Are Earthwork Excavation 124 Concrete For Lining Sides And Bed, Skin Reinforcement For Lining. General-Pvip Action Plan 2025-26- Rectification Of Vadayambady Md Between Ch 3.300 Km And Ch3.450 Km For The Year 2025- 26-General Civil Work
Estimate For Hiring Of Vehicle For Inspection Of Project Estimate For Remodeling/Relining Of Dhipali Disty Rd 0-130900 Off Taking At Rd 221570/R Of Bathinda Branch By Concrete Lining M-15 Concrete Mix, Mixed In Automatic Batching And Mixing Plant, Ca
Canal Structure Works Concrete Lining At Vulnerable Portions In Between Rd 0.908 Km To Rd 1.120 Km Of Mandiabandh-bodigaon Sub Minor Of Tmip
Canal Structure Works Concrete Lining Of Piteiguda Benagaon Minor At Rd 0.900 Km To Rd 1.07 Km
Canal Structural Works Concrete Lining At Vulnerable Portions In Between Rd 1087.5 M To Rd 1195 M Of Tokiguda Bahinipatiguda Minor Of Tmip Including Restoration Of Damaged Section
Cement Concrete Lining Cement Concrete Lining To Gop Branch Canal From Rd 4.60 Km To 10.800 Km
Repairs To Crack In Concrete Lining Portion Of Khedashi - I Tunnel In Km 199/000 - 100 In Aen Ratnagiri Section. Bi
Construction Of Concrete Lining In Main Canal From Rd 320m To 520m Of Nuapadar Mip In Phiringia Block Of Kandhamal District Under Critical Grant For The Year 2025-26
Repair Of Canal Siphon At Rd 179M With Construction Of Concrete Canal Lining Of Uppersahi Mip In Phiringia Block Of Kandhamal District Under Critical Grant For The Year 2025-26
Providing Cement Concrete Lining Protection Work On D/s Of Drop Cum Slrb At Km 17.610 Of Madhira Branch Canal Of 21st Mbc