Surat Lignite Power Plant - 4x125 Mw, Unit - 1 To 4: Biennial Rate Contract For Handling, Mechanical Maintenance And Housekeeping Of Lignite Handling, Limestone Handling, Milling And Conveying System And Ash Handling System For 2 Years Period 2026-28
Removing Hard Clinkers From Bottom Ash Hoppers And Collecting, Transporting Of Ash From Bypass Chute In Bottom Ash Conveying System
Development Of Feeding System, Suitable Conveying System For Transportation Of Iron Ore From Kumaraswamy Mine To Swamihalli Siding Stacking Spreading Weighing And Loading Into Rail Wagons At Swamihalli Siding At Donimalai Karnataka On Build, Ope
Development Of Feeding System, Suitable Conveying System For Transportation Of Iron Ore From Kumaraswamy Mine To Swamihalli Siding Stacking Spreading Weighing And Loading Into Rail Wagons At Swamihalli Siding At Donimalai Karnataka On Build, Ope Ho Contracts Kiom Swam Ham Nmdc 2025 279
Overhauling Of Esp Ash Conveying System In Srp At Tnpl Unit Ii Overhauling Of Esp Ash Conveying System In Srp At Tnpl Unit Ii Trichy
Gem Bids For Custom Bid For Services - Modification Work For Erection &fabrication Of Additional Pressure Conveying System In Esphopper For Ahp, Rtps-dvc
Cam Divn: Replacement Of 250 300 350nb Cast Basalt Fittings And Pressure Conveying System Maintenance Works As And When Required During The Fy2025-26
Fly Ash Conveying System Spares For Ahp Area. Procurement Of Fly Ash Conveying System For Ahp Area
Procurement Of Gi Fittings For Connecting Auxiliary Spares In Fly Ash Evacuation And Conveying System In Fly Ash Handling System Of Cam Division Of Ktps-vii Stage-quotation Called For Regarding.
Design Supply Erection Installation Testing And Commissioning Of Automatic Milk Pouches Stacking Collating And Conveying System At Trichy Dairy For The Year 2025-26 Design Supply Erection Installation Testing And Commissioning Of Automatic Milk Pouches Stacking Collating And Conveying System At Trichy Dairy