Installation Of Hydraulic Hoses For Cutter Suction Dredger Shipra For The Year 2025-26
Gem bids for Cutter Suction Dredger With All Accessories & Sparescapacity Min 1000 M /Hr With 120-200 M / Hr, Supply Ofsuitable Multipurpose Boat For Dredger As Mentioned In Afor Minimum 4 Persons Occupancy, Maintenance Of Dredgerand Boat Mentioned In A & B For 02 Years From The Date Ofcommissioning
Installation Of Hydraulic Hoses For Cutter Suction Dredger Shipra For The Year 2025-26
Gem Bids For Maintenance Of Dredger For 02 Years From The Date Of Commissioning , Supply Of Suitable Multipurpose Boat For Dredger For Minimum 4 Persons Occupancy , Self-propelled Diesel Driven Cutter Suction Dredger With All Accessories & Spares Capacity Min 1000
Dredging Work Along 7.00 Km Downstream Stretch Of The Kolong River From Jakhalabandha Stadium Through Manual Cleaning, Cutter Suction Dredger And Chain-Mounted Excavators For The Year 2025 26 Phase-I
Restoration Of Waithou Pat Water Body Sh Earthwork In Surface Excavation By Using Cutter Suction Dredger, Over Areas
Dredging Of The River Brahmaputra From Lachit Ghat Near North-South Guwahati Bridge Towards Kamakhya Hills With The Help Of Cutter Suction Dredger And Fleet Of Machineries.
Supply And Installation Of Cutter Suction Dredger Monitoring System For Iwai Vessel
Supply And Installation Of Cutter Suction Dredger Monitoring System For Iwai Vessel
Dredging In Front Of Repair Dock And Building Dock Mouth As Per The Dredging Plan To Lines/Levels/Slopes Using Cutter Suction Dredger Csd And Disposing Off And Dumping Materials Through Float Pipelines Approx. 100M. Depth 9.5M - 7.5M From Cd. Deployment Of Csd For Dredging Rd And Bd Mouth