Replacement Of Worn Out Intermediate Frame And Deck Plats, Installation And Erection Of Idler Frame With Roller, Return Rollers Fabrication And Erection Of Same And Welding Of Carrying Rollers And Idler Frame With Deck Plates Of Unit No. 701-1 Belt C
Replacement Of Worn Out Intermediate Frame, And Deck Plates, Installation And Erection Of Idler Frame With Roller, Return Rollers, Fabrication And Erection Of Same And Welding Of Carrying Rollers And Idler Frame With Deck Plates Of Unit No. 901-1 Bel
Dismantling Of Damaged Deck Plate, Idler Frame With Rollers, Installation And Erection Of Same, Fabrication And Erection Of Deck Plate Of Unit No. 1402 Belt Conveyor Of Middle Portion Of Loading Section At Madhuban Coal Washery Under Block-Ii Sarea
Repairing/ Strengthening And Replacement Of Damaged Posts, Stinger Channel, Columns, Deck Plate Of Conveyor Frame For Unit 502 And Repairing/ Strengthening Of Stringer Channel, Post, Bracing Angle, Deck Plate And Discharge Chute For Unit 801-a Belt
Replacement Of Worn Out Intermediate Frame And Deck Plates, Installation And Erection Of Idler Frame With Roller, Return Rollers, Fabrication And Erection Of Same And Welding Of Carrying Rollers And Idler Frame With Deck Plates Of Unit No. 902-1 B
Repairing / Strengthening And Replacement Of Damaged Posts, Stinger Channel, Columns And Deck Plate Of Conveyor Frame For Unit 502 At Moonidih Coal Washery.
Gem Bids For Repair And Overhauling Service - Ru Locker For Storage Ofcleanship Material In Bathroom Alleyway To Be Fabricatedand Kirting Frame In Lower Deck Dining Hall And Alleywaydeteriorated Same Needs To Be Renewed; Ru Locker Forstorage Of Cleanship Mate
Gem bids for 4 Dctc Lower Section Sliding Part Upper Part Frame For Crush Deck.
Repair Maintenance And Installation Of Plant Systemsequipments Version 2 - Coal Mines; Electrical System Or Installation Repairing Of Top Roller Bracket And Its Related Job And Fabrication Erection Of Deck Plate Frame Portion In Belt Conveyor ..
Replacement, Repairing Of Worn Out Intermediate Frame And Deck Plates, Installation And Erection Of Idler Frame With Rollers, Return Rollers, Fabrication And Erection Of Same At 902-2 Tail End Side Belt Conveyor Of Ps-9 Section At Madhuban Coal Washe