Dismantling Of Old Block B-3 And B-4 At New Police Line And Remove The Scrap From Site And Levelling The Land.
Gem Bids For Excavation Of Earth, Pcc 1 2 4, Rcc M25, Reinforcement, Brickwork Cm 1 4, Plaster 18mm 1 4 Wall, Snowcempainting 2coat, Cement Primer, Weather Coat Paint, Concertina Wire, Straight Concertina, Steel Structure, Screen Wall Upto 5m Height, Upvc 100mm Dia Pipe Forweephole Retaining Wall, Coping Beam Rcc M30, Reinforcement Of Copping Beam, Coping Beamplaster 18mm Cm 1 4, Dismantling Of Boundary Wallbrickwork, Dismantling Of Old Damage Structure
Gem Bids For Dismantling Of Existing Of Apfc Panel, Design, Erection Andsupply Of New Apfc Panel, Installation, Testing Andcommissioning
Minor Repair Work Of Footpath And Divider Washing And Painting Of Divider Dismantling Of Unauthorized Stalls Structures On Footpath During Deep Clean Drive Work At C.d.barfiwala Road Masjid Gully M.a Road V.m. Road Location In Kwest Ward.
Dismantling 02 Rooms, Construction Of 01 Room, Kitchen Shed And Toilets Repairs Etc., In Mpps Ragendra Nagar Hanumanthunipeta V Of Peddapalli M
Ground Leveling, New Compound Wall, New Kitchen Shed And Dismantling Of Old Rooms And Paitning To Entire School At Mpps Medipalli Of Ramagundam M
Tender For 5 Rooms Dismantling, Ground Levelling, Path Ways, New Compound Wall 220m, Doors, Windows Replacement Etc., In Zphs Nittur V
Ground Leveling, New Girls Toilet And Dismantling Of Rooms And Painting Entire School At Zphs Jangaon Of Ramagundam M
New Acr And Dismantling Of Old Rooms At And Painting To Entire School Mpps Mallialapalli Of Ramagundam M
Work Of Stripping & Fitment Of Foot Step Of Lhb Coaches, Cbc & Draft Gear Of Lhb Coaches, Stripping And Fitment Of Foot Step, Stop Screw, Screw Coupling, Draw Hook And Draw Bar With Pads, Draft Key Plate, Draw Hook Support Beam, Suspension Hook, Nylon Bushes Of Brake Gear Components Of Icf Coaches, Stripping, Overhauling & Fitment Of Isolating Cocks & Check Valves Of Icf Coaches And Fitment With Proper Alignment Of Bogie Mounted Brake Cylinder Of Icf Coaches, Stripping & Fitment Of All 4 Side Buffer Assembly Of Icf Coaches (per Coach) And Dismantling Of Side Buffer Assembly At Jagadhri Workshop