Kodinar Wss 4Th Invitation Under Amrut 2.0 : Working Survey, Soil Investigation, Design & Construction Of Water Treatment Plant, Clear Water Sump Cws, Pump House, Elevated Service Reservoir Esr, Compound Wall, Road Crossing, Supplying, Lowering, Laying And Jointing Di Pipeline For Clear Water Rising Main Pipeline And Providing, Supplying, Lowering, Laying And Jointing, Pvc Distribution Pipeline, Providing, Supplying, Erecting And Testing Of Pumping Machineries, Electrification Work Etc. At Various Head Works. Including Operation And Maintenance For 05-Years Including 03-Yeras Defect Liability Period For Kodinar Water Supply Scheme. Taluka: - Kodinar Dist.: -Gir Somnath, Gujarat
Providing Pumping Main Pipeline At Borewell To Oht In Jayankondan, Providing Borewell With Submersible Pumpset With Pipeline At Colony Munishwaran Kovil Near In Alampoondi, Providing Distribution Pipeline At Arunthathiyar Colony In Reddipalayam Gingee 15Th Cfc Bp 2025-26 Pack6
Distribution Pipeline Village Loliya Taluka Dholka District Ahmedabad ( Thirdtrail)
Tirupathur District 15 Cfc 2025-26 Providing Pipeline Distribution System From Mgr Nagar To New Colony Parandapalli X Road H/O Puthagaram Package No.04
Deposit-Pmgsy25-26 - Utilty Shifting - Arwss To Krishnagiri, Purakkady And Ambalavayal Villages- Relaying Of The Existing Distribution Pipeline Along Arivayal-Padavayal-Poolakadave - Pullumala Roadkr14-38-Pipeline Workretender Wrd/Kwa/Ce-Nr/Tr/13220 Re-Tender
Work Of Construction Of Sources, Rising Main Pipelines, Rcc Reservoir, Internal Village Distribution Pipeline And Fhtc Including 1 Year Dlp Of Village Bantkhani Under Subdivision Neemrana Under Jjm In The Jurisdiction Of Phed Division Behror Kotputli
Laying Of New Upvc/di Pipeline In The Distribution System And Providing Fhtc Bandh To The House Of Ananta Ray In Connection With The Apas Booth Level Camp Proposal To Resolve The Drinking Water Issue At Barobisha Village
Laying Of New Upvc/di Pipeline In The Distribution System And Providing Fhtc From The House Of Tapan Ray To Atin Ray In Connection With The Apas Booth Level Camp Proposal To Resolve The Drinking Water Issue At Barobisha Village
Laying Of New Upvc/Di Pipeline In The Distribution System And Providing Fhtc At Zilla Parisad Road To Simla Para In Connection With The Apas Booth Level Camp Proposal To Resolve The Drinking Water Issue At Radhanagar Village
Laying Of New Upvc/di Pipeline In The Distribution System And Providing Fhtc Near The House Of Swapan Chowdhury At Hala Ghat. From Zilla Parisad In Connection With The Apas Booth Level Camp Proposal To Resolve The Drinking Water Issue At Radhan