Slip Clearance Mulba Of Patta Nallah, Cross Drainage Syphon At Rd 250m And Crossdrainage Syphon At Rd 975m And Mulba Slip Clearance From Water Conductor From Rd 0 M To 375m, Rd 1835m To Rd 1860m, Rd 2570m To 2600m And Rd 2680 To 2710m Of Swea Iii Hep
Clearing The Silt Deposited In Approach Channel, Tail Channel And Barrel Of Drainage Syphon At Ch. 82.344 Km (medi Kotar) And Ch. 98.178 Km (kakaria Kotar).
Reconstructing Of Drainage Syphon Structure At Ch.79.15 Rd On Krbmc.
Enquiry For Cleaning Of Slit/slush Debris From 8 Nos Drainage Syphon Constructed In Between Km 25.60 To Km 36.57 Of Cwc And Nallah Training At D/s Of 3 Nos Syphon At Silpara
Construction Of Cross Drainage Pipe Syphon At Km. 2.460 Of Salarpur Minor.
Construction Of Drainage Syphon At Rd 4700m Of Baghua Distributary For The Year 2025-26
Reconstructing Of Drainage Syphon Structure At Ch.59.41 Rd On Krbmc
Reconstructing of Drainage Syphon Structure at Ch. 73.67 RD On KRBMC.
Reconstructing Of Drainage Syphon Structure At Ch.77.45 Rd On Krbmc.
Reconstructing of Drainage Syphon Structure at Ch.67.83 RD On KRBMC.