Gem Bids For Custom Bid For Services - Hiring Of 1 No Excavator/poclainex-210 Or Equivalent Is Required On Hourly Basis For A Periodof 12 Months At Fod Area To Attend The Various Work Duringpeak Production Period, Pre Monsoon Period, Post Monsoonperiod And Mo..
Hiring Of Hydraulic Excavator Back Loader For A Period Of 01 Year In Ndmc Area
Gem Bids For Hiring Of Earth Moving Equipments, Material Handlingequipments And Cranes Per Hour Basis - As Per Buyersrequirement; 3d Hydraulic Excavator; Wheeled Hydraulicexcavators, Hiring Of Earth Moving Equipments, Materialhandling Equipments And Cranes Per Hour Basis - As Perbuyers Requirement; As Per Bid Docs; Wheeled Hydraulicexcavators
Hiring One Excavator On Float And One Front End Loader Equipment With Back Hoe Attachment For Monsoon Preparedness Works In Zone Xiii For A Period Of 90 Days R.D.C.S.M.E.D.C.No S1/201/2025
Hiring Of 1 Excavator And 3 Nos. Of Tractor Trolly For Removal Of Dumpedearth/ Sludge/ Mill Reject Deposited Along Boundary Wall, Drain And Roadinside Plant At Ntpc Kahalgaon For 12 Months On As And When Requiredbasis.
Hiring Of Hydraulic Excavator With Rock Breaker 210-Tata Hitachi Or Its Equivalent 1.00/1.35 Cum One Point Zero Zero/One Point Three Five Cubic Metre Bucket Capacity. In Various Rds R.R.D. On Various Roads Under Kotli Subdivision, Hppwd Kotli
Rr Damages On Rcd Road Km 000 To 92695 Sh Hiring Of Excavator Cum Loader Pock Lane For Removal Of Slips Co Drain And Dressing Of Road Surface From Km 5100 To 7100
Hiring Crawler Type Excavator Backhoe Type Bucket With Minimum 0.6 Cubic Meter Capacity, Boom Length Of 4.6 Meters And Arm Length Of 2.1 Meters For Mrpl Sulphur Unloading From Trucks And Sulphur Heaping At Sulphur Go-Down, Fact-Uc.
R/o Rain Damages To Barotiwala To Gunai Road In Km. 0/00 To 19/120.sh Hiring Of Excavator Cum Loader And Tractor With Trolly For Removal Of Slips And Clearance Of Road Side Drain In Km. 9/00 To 14/00
R/R Damages To Garkhal To Subathu Road In Km. 0/00 To 17/315. Sh Hiring Of Excavator Cum Loader For Removal Of Slips And Clearance Of Road Side Drain And Hiring Of Tipper For Shifting Of Earth And Debris In Km. 12/500 To 17/315 R/R Damages To Garkhal To Subathu Road In Km. 0/00 To 17/315