Gem Bids For Engineer And Fabrication Work Size 18 By 12 Height 6 Point35 Meter To 8 Meters Including Fire Sprinklers, Dock Area 7by 4 Meters, Office Area Of 3 By 3, Ramp For Forklift, Canopy To Cover Complete Docking And Ramping Area, Vertical Elevation From Flooring, Repository Design, Lighting Conduit Laying Of Pvc Electrical Conduit Pipe 25mmby 32mm, Wiring Copper Wire Size 1 Point 5 By 3 By 6, Board Switch And Sockets, Lights And Fans, Lightingarrestor, Earthing Chemical Earthing Electrode, Workstations Including Table Chair Almirah And Othernecessary Items, Split Air Conditioner, Cctv Surveillancesystem, Rolling Shutter Door For Warehouse, Manual Door, Biometric Access, Office Area Entry Door, Fire Line, Firehose Reel And Fire Hydrant, Sprinkler, Smoke Detector, Fire Pump, Fire Tank 25000l, Solar System, Electricforklift, Project Management Consulting, Projectmanagement Execution And Installation And Commissioningand Freight And Training
Repair And Maintenance Of Hydrant Pipe Line Of Fire Fighting System Installed At Bsf Hangar, Palam Under Fhq Bsf New Delhi
Providing & Laying New M.s. Pipe Line And Fittings For Fire-hydrant System & Construction Of One Pump-house In Workshop Under Sse/w/ws
Ttps Operation Circle Oe Ii Fps Fabrication, Erection And Commissioning Of A1/2 Impulse Line With Control Valve For Fixing Of Pressure Gauge At Various Location In Fire Hydrant Line And Fixing Of Pressure Switches At Mulsifyre Line Including Supply
Hiring Of Consultant Fire Hydrant Line System Engineering Design Scope Of Work Drawing Erection Testing Commissioning Hiring Of Consultant For Fire Hydrant
150 Nb Seamless Pipes For Echs Yard Conveyor Fire Hydrant Line
Rcc Trench Construction For Fire Pipe Road Crossing 7 Replacing Ug Fire Hydrant Line At Bolpur It Park Webel Eot W 25 26 000028
Dismantling And Relocating Of Existing Fire Hydrant Line, Followed By Cutting, Shifting, Edge Preparation, Fabrication, Installation And Testing At Reprocessing Plant Rwm, Nrb, Barc
Sa 106 Gr C 150 Nb Seamless Pipes For Fire Hydrant Line In Fire Fighting System
Replacement Of Damaged Fire Hydrant Line Near Gate No-4 And 5 And From Gate No-1 To Pragyan Hostel, Phase-i And Ii, Ilbs