Capital Overhauling Aoh 2025- Arresting Fly Ash Leakage From The Damaged Portions Of Concrete In Between Rcc Shell Top And Roof Deck Sheet And Around Supporting Angles Of Fly Ash Silo 1 And 2 And Bottom Ash Silo 1 And 2 At Mtps-Ii. Ot-07
Supply Of Fluidising Blower Model No.89wc For Silo In Fly Ash Handling System
Supply Of M/s.ingersoll Rand Make Iac Spares At Silo Area In Fly Ash System
Mtps Ii Es Circleem Division Overhauling Works In Lt Bus Of415v Lt Esp Abcd Fly Ash Ash Silo Switchgears Complete Cleaning Tightness Checking Of Horizontal Vertical Bus Bar Bus Bar Joint Outgoing Terminals Checking Ir Value A Ot 12/25-26
Supply Of Dust Conditioner Pump And Its Spares At Silo For Fly Ash System
Nctps Ii Civil Maintenance Circle Civil Maintenance Division Ii Repair And Maintenance Works Of Steel Staircase And Concrete Structures In Fly Ash Silo At Nctps Ii
Replacement Of Boiler 1 To 4 Fly Ash Silo Manually Operated Discharge Sliding Gate At Energy-mechanical In Tnpl Unit-i
Annual Work Contract For Cleaning Of Accumulated Fly Ash Dust Around The Silo Of Phi Phii Phiii Silo Area Roadsopen Space Near Silo By Hiring The Jcb Machine With Diesel And Operator Loading Into The Trucksdispose Off Into Ash Sump At 4x210mw Silo
Annual Maintenance Contract Amc For Ingersoll Rand I Ltd Make 2 Nos Instrument Air Compressors Model Sm55-ac At Silo Area In Fly Ash Handling System Of Ktps Vii Stage For A Period Of One Year From The Date Of Commencement Of Service Purchase Order
Supply Of 200nb, 250nb And 300nb Ms Erw Pipe For Unit-i, Ii And Iii Surge Hopper To Silo Fly Ash Conveying Lines