Geological Exploration By Extension Of 02 Nos. Existing Drift Of Size 1.8X2.1M, Rdr-2 By 100M Length At El293m And Rdr-3 By 150M Length At El 418M At Right Bank With 04 Nos. Head Room Or Working Space 02 Nos. On Each Drift Of Size 5Mx4mx4.5M Fo
Topographical Survey, River Survey, Command Area Survey And Geological And Foundation Exploration Of Kokalaba Dw At Khajuripalli In J.n.prasad Block Under S.i Grant 2025-26
Geological Exploration By Extension Of 01 No. Of Already Existing Drift Rdr6, Drift Size 1.8X2.1M Rectangular Section By Another 130 M On Right Bank Of River Subansiri At Power House Site Of Subansiri Upper Project In Arunachal Pradesh
Mahindra Bolero Neo Vehicles Including Driver And Fuel For Geological Exploration, Inspection Of Geological Sites, Government Work And Other Field Works In The Entire State By The Geology Directorate, Mines And Geology Department
Geological Exploration Work For Different Minerals And Coal, Covering Core Drilling/Combination Of Core And Non-Core Drilling, Topographical And Dgps Survey, Geological Mapping, Core Logging And Sampling, Geophysical Survey Both Surface
Brick Work And Geological Exploration By Geophysical Method Electrical Resistivity Survey
Geological Exploration By Extension Of 01 No. Of Already Existing Drift Rdr6, Drift Size 1.8X2.1 M Rectangular Section By Another 130 M On Right Bank Of River Subansiri At Power House Site Of Subansiri Upper Project
Geological Exploration By Extension Of 01 No. Of Already Existing Drift Rdr6, Drift Size 1.8X2.1 M Rectangular Section By Another 130 M On Right Bank Of River Subansiri At Power House
To Carryout Bore Hole Sampling And Logging Of Earthen Dams Masonry Dams Of Powai Lake Vihar Lake And Tulsi Lake For Exploration And Geological Investigation As Per Suggestion Of Central Design Organization Nashik Under Aeoc Tm Division In S Ward
Empanelment Of Agency For Geological Report Writing Work For Geological Exploration Core Drilling