Gem Bids For Hopper Tipper Dumper For Garbage (q2)
Work Of Complete Overhauling Of Bottom Ash Hopper And Its Connected Parts Such As Seal Trough, Seal Plate, Flushing Nozzle, Drip Shield, Refractory Cooling Pipes Etc. On As And When Required And Aoh-coh In Ash Plant Unit 3 To 5 At Ukai Tps. Wt-5018 Ahp-2.
Gem Bids For Hopper Tipper Dumper For Garbage Q2
Supply And Delivery Of Nalaman With 3 Cubic Hopper Capacity For Desilting And Cleaning Of Municipal Open Drains
Gem Bids For Hopper Tipper Dumper For Garbage Q2
Supplying, Stacking And Loading Into Railway Ed Wagons/boxes/hoppers Stone Querry Dust/boulders And Unloading At Makronia /girwar /patharia /damoh /ghatera/sagoni / Any Where In Bina-katni Section.
Supplying Material - Moorum Vibratory Rollor 8 To 10 Tonne Water Tanker 5 To 6kl Capacity Aggregate 90 To 45mm Power Roller For 60mm Laterite Metal Steel Centring For Foundation Electric Vibrator Aggregate 40mm (hand Broken) Blasted Stone Aggregate 12.5mm Stone Aggregate 20mm Coarse Sand As Per Is 383 @ 0.45 Cum Portland Cement Hire Charges Of Concrete Mixer 0.25 To 0.40cum With Hopper Generator 250kva Fine Sand ( Zone Iv) Tile Cutting Machine Bitumen Ng 30 Tin (60/70) Material Cost Rs.1/- Per Unit Extra Charges For Construction Of Cement Concrete Road At Dhokeshwar Mandir Road At Dhoki Tal- Parner
Gem Bids For Hopper Tipper Dumper For Garbage Q2
Supplying Material - Moorum Vibratory Rollor 8 To 10 Tonne Water Tanker 5 To 6kl Capacity Aggregate 90 To 45mm Power Roller For 60mm Laterite Metal Steel Centring For Foundation Electric Vibrator Aggregate 40mm (hand Broken) Blasted Stone Aggregate 12.5mm Stone Aggregate 20mm Coarse Sand As Per Is 383 @ 0.45 Cum Portland Cement Hire Charges Of Concrete Mixer 0.25 To 0.40cum With Hopper Generator 250kva Fine Sand ( Zone Iv) Tile Cutting Machine Bitumen Ng 30 Tin (60/70) Material Cost Rs.1/- Per Unit Extra Charges For Construction Of Cement Concrete Road Kamatwadi Bitumin Road To Nilesh More Wasti At Waranwadi Tal- Parner
Insulation, Refractory And Removal Of Fly Ash, Debris From Pressure Part, Ducts, Hoppers And Roof Of Pent House Etc. Including Insulation Of Id/fd/pa Fans And Mills Of All The Seven Units Of All Three Stages A, B. D Tps Of Anpara During Breakdown