Supply Of Supply Of Smps Based Integrated Power Supply System For L.c Gate
Supply Of Supply Of Smps Based Integrated Power Supply (ips) Etc. (detailed Description As Per Item Description)
Ajmer Division: Comprehensive Annual Maintenance Contract Of Smps-based Integrated Power Supply System Of Hbl Make Installed At 07 Stations Over Ajmer Division Nwr For Three Year
Ajmer Division: Comprehensive Annual Maintenance Contract For Testing/repairs/replacement Of Various Modules/components Of M/s Statcon Electronics Make Ips (integrated Power Supply) System At Various Stations/ibh/lc's In Ajmer Division For 3 Years.
Provision For Comprehensive Annual Maintenance Contract Of Smps Based Integrated Power Supply Systems Manufactured By M/s Statcon Energiaa India Limited In Khurda Road Division For A Period Of Three Years.
Supply Of Sealed Maintenance Free Vrla Battery Set Of 60 Cells(stackabie), In Combination Of 55+5cei1s For Smps Based Integrated Power Supply System.
Comprehensive Annual Maintenance Contract (amc) Of Statcon Make Integrated Power Supply (ips) Systems Installed At 14 Locations (lc-09 & Stn -05 No.) Over Firozpur Division For Three (03) Years
Design, Supply, Installation, Testing And Commissioning Of Indoor And Outdoor Signalling Works Consisting Of Electronic Interlocking With Inbuilt Block Instrument, Hassdac, Msdac, Integrated Power Supply System, Data Loggers, Rdpms Etc., And Associated Works At Stations Yog Nagri Rishikesh, Shivpuri, Byasi, Devprayag, Janasu, Maletha, Srinagar, Dhari Devi, Tilani, Gholtir, Gauchar, And Karnaprayag (120.30 Km) Section, Including Tunnels T1 To T16, In Connection With The New Single Bg Rail Line Between Yog Nagri Rishikesh And Karnaprayag In Moradabad Division Of Northern Railway In The State Of Uttarakhand, India.
Comprehensive Annual Maintenance Contract Of Integrated Power Supply System Of Make Electric Industries Installed Over The Izzatnagar Division Of Ner For 3 Years
Comprehensive Annual Maintenance Contract (amc) Of Hbl Make Integrated Power Supply (ips) Systems Installed At 07 Stations Over Firozpur Division For Three (03) Years