Selection Of Organization For Conducting Third Party Evaluation Study On Installation Of Micro Irrigation Systems Through Per Drop More Crop Scheme In Tamilnadu For The Period From 2022-23 To 2024-25 In 15500 Numbers Of Farmer Fields
Supply Installation, Testing And Commissioning Of Micro Irrigation Systems/ Drip Irrigation Systems Work At Spituk Gompa Under Design, Supply, Installation Of Solar Submersible Pumps At Various Locations Of Leh District Sdp
Supply And Installation Of Solar Powerd Central Pivot Irrigation Systems For The Juridiction Of Mpkv, Rahuri, Ahilyanagar
Improvement Of Canal Systems Of Dahuka Irrigation Project
Rehabilitation Of Irrigation Systems In Kuranganpallam Odai Hanuman Nadhi In Modakurichi And Kodumudi Taluks Of Erode District
M/R To All Canal Systems Of Nageshpur Irrigation Sub Division For The Year 2025-26 Engagement Of Casual Labour For Kharif Water Supply
Maintenance And Repair To Kendrapara Canal And Systems Under Barbodia Irrigation Section And F.c Section-i Of Kendupatna Irrigation Sub Division For The Year 2025-26 Engagement Of Casual Labour For Kharif Water Supply
Supply Et Installation Of Piped Distribution System, Micro Irrigation Systems (sprinkler, Mini-sprinkler, Drip Irrigation, Micro Sprinkler, Centre Pivot, Rain Gun), Automation & Ofwt, For A Period Of 5 Years
Rehabilitation Of Irrigation Systems In Kuranganpallam Odai Hanuman Nadhi In Modakurichi And Kodumudi Taluks Of Erode District
Construction Of Solar Marsablepump For Irrigation Systems Mouza Jotkabir