Chp-mm-hiring Of Shovel 0.85 Cum, 110hp Hydraulic Excavator Capacity On Hour Basis Without Fuel Hsd Oil, Including Hire And Crew Charges Round The Clock As And When Required For 7 Months From The Actual Date Of Commencement/utilization Or Till The Completion Of Quantity For Clearance Of Rc Hopper Grid Jams Pertaining To Chp Mm1 Sub Division-1, Ktpp During The Year 2025-26
Engaging Of 02no Back Hoe Loaders Of Engine Capacity Not Less Than 48hp For Clearing Of Grid Jams At Wagon Tippler-1 And 2 And On Track Hopper-1a And1b Grid For Facilitating Further Unloading Of Coal Tipper And Also For Removal Of Spilled Over Coal While Unloading Of Coal Trucks Pouring Back The Same Into The Respective Grids And Also For Clearing The Chain Conveyor Jams At Contingency Arrangement-1and 2 On Round The Clock Basis For Arraigning Uninterrupted Coal Feeding To The Units-1, 2, 3 And 4 Of Btps For The Period Of 45 Days I.e. From 29.08.2025 Or From Actual Date Of Commencement Of Work.
Hiring Of Shovel 0.85 Cum, 110hp Hydraulic Excavator Capacity On Hour Basis Without Fuel Hsd Oil, Including Hire And Crew Charges Round The Clock As And When Required For 9 Months From The Actual Date Of Commencement / Utilization To Till The Completion Of Quantity For Clearance Of Rc Hopper Grid Jams Pertaining To Chp Mm1 Sub Division-1, Ktpp
Clearing Of Jams In Slag Pots-Sms-2.
Tap Hole Operation For Restarting Of Bf3 After Long Shutdown And Upkeeping Of Tlc Jams
Hiring Shovel 0.85 Cum, 110hp Hydraulic Excavator Capacity On Hour Basis Without Fuel Hsd Oil, Including Hire And Crew Charges Round The Clock As And When Required For 3 Months From The Actual Date Of Commencement/utilization To Till The Completion Of Quantity For Clearance Of Rc Hopper Grid Jams Pertaining To Chp Mm1 Sub Division-1 Ktpp
Regular Maintenance & Breakdown Works And Clearing Of Coal Rejects Jams In Various Locations Of The Mill Rejects System In Unit-3 As And When Required During The Year 2025-26 Sdstps
Regular Maintenance & Breakdown Works And Clearing Of Coal Rejects Jams In Various Locations Of The Mill Rejects System In Unit-3 As And When Required During The Year 2025-26
Engaging Of 02No Back Hoe Loaders Of Engine Capacity Not Less Than 48Hp For Clearing Of Grid Jams At Wagon Tippler-1 & 2 And On Track Hopper-1A & 1B Grid For Facilitating Further Unloading Of Coal Tipper And Also For Removal Of Spilled Over Coal While Unloading Of Coal Trucks Pouring Back The Same Into The Respective Grids And Also For Clearing The Chain Conveyor Jams At Contingency Arrangement-1 & 2 On Round The Clock Basis For Arraigning Uninterrupted Coal Feeding To The Units-1, 2, 3 & 4 Of Btps For The Period Of 45 Days From 06.12.2024 Or From Actual Date Of Commencement Of Work
Removal Of Jammed Coal In Mill Feeders, Bowl Mills, Ducts & Chute Jams In Rejects Of Unit-5, 6, 7 & 8Xrp-803/903 Mills.