Replacement Of Steel Trough For Bri. No. 24 Up & Dn1x30.5 With H Beam Sleepers And Regirdering Of Bridge 26 Up, 26 Rh Girder, Replacement Of Steel Trough With Provision Of H Beam Sleepers At Br. No. 16 Pg 8X24.4M+Pg 4X18.3M+Pg 2X6.1 M In Jnh-Zbd Section In C/W Removal Of Temporary Speed Restrictions Over This Bridge.Provision Of Side Pathway And Trolly Refuges On Br No-16 Pg 8X24.4M+Pg 4X18.3M+Pg 2X6.1 M In Jnh-Zbd Section, Replacement Of Girder Of Bridge No 14 Dn, 15 Up And 15 Dn Between Bsb-Ddu Section Under Aden/Bsb., Fabrication & Erection Of Shed To Cover Open Space B/W Station Building And Platform At Pygs Station, Dismantling Of Platform Sheds On Pf No 1 & 2/3 At Prg Station Fouling The Alignments Of New 12 Mtr Wide Fob And Re-Assembling Of These Sheds On Platforms And Dismantling Of Stair Case Of Fob No. 2 & Erection At New Location And Fabrication & Erection Of Steel Structures In Connection With Provision Of 3 No. Lift At Prg Station & Emergent Repair/Replacement Of Vertical Channel Of Top Shed Of Fob-2 & Replacement Of Damaged Protection Sheet Of Fob-2 At Bsb Station