Supplying And Spreading 10000 Cum Of 65 Mm Gauge Machine Crushed Stone Ballast On Cess In On-blm And Blm-spc Section Under Sr.den-ii/mb.
Supplying And Stacking 65 Mm Gauge Stone Ballast Machine Crushed (hard Stone) Conforming To Rdso Specification Along The Cess Including All Station Yards From Km: 92.000 To Km: 133.000 Between Modran (incl.) - Marwar Kori (incl.) Section Of Jodhpur Division In Connection With Luni - Samdari - Bhildi Doubling Project.
Supply, Stacking And Mechanized Loading Of 1,50,000 Cum Machine Crushed Track Ballast Of 65mm Gauge As Per Railway Specification Is/rdso-ge/0001:2023- February-2023, At Parichha (pic) Depot Under Assistant Divisional Engineer/north Central Railway/fatehpur.
Supplying Of 50000 Cum. 65mm. Size Machine Crushed Stone Ballast Of Approved Quality And Loading Into Hoppers/ Wagon At.
Supplying And Stacking Of 50000 Cum Of Machine Crushed Stone Track Ballast 50 Mm Size Conforming To Rdsos Specifiction Of Track Ballast February - 2023 Edition With Upto Date Correction Slips From Pakur/Bakudih/Barharwa Or Any Other Approved Quarry Of Sahebganj Range For Sonpur Division At Thanabihpur Ballast Siding/Depot Of East Central Railway
Supplying Of 60000 Cum Of Machine Crushed Track Ballast 50Mm Size Conforming To Rdsos Specification Of Track Ballast February - 2023 Edition With Upto Date Correction Slips And Loading The Same Into Any Type Of Railway Wagon, F.O.R. Pakur /Bakudih/Barharwa Or Any Other Quarry Of Sahebganj Range For Sonpur Division.
Proposed Collection And Training Out Of 50Mm Machine Crushed Hard Stone Ballast At Shoranur Depot.
Manufacturing, Supply And Stacking Of Machine Crushed Ballast In Murkongselek Depot Of Tsk Division.
Nanded Division: Mudkhed- Pimpalkutti Section: Manufacturing, Supply And Stacking 50Mm Of Machine Crushed Track Ballast Conforming To Rdso Specification Irs-Ge-1 With Latest Correction Slips At Railway Depot At Bhokar Bokr Or Nominated Location. At Bhokar Bokr Ballast Depot And Loading Railways Ballast, Collected At Yard / Depot Into Railways Bob / Bkh / Any Other Type Of Open Wagon, Using Mechanical Loader Or Any Other Method With All Lead And Lifts, As Directed By Engineer In-Charge . Under Aden/Neds Jurisdiction For Completion Period 24 Twenty Four Months Including 03Three Months Mobilization Period.
Supplying, Stacking And Loading Into Railway Hoppers Of Machine Crushed Ballast As Per Revised Specification Rdso/Irse/Ge-I Of June 2016 With Latest Amendment At Patas Depot Under Aden/Dds Section. Qty 100000 Cum Qty Chargeable To Sanctioned Track Renewal Work Rrsk/Ph 31