Shifting The Existing Ht/Lt Pcc Pole And Transformer Situated In The Middle Of The Rojhuwas Approach Road Due To Be Widened From 12 Feet To 18 Feet From Rohrai To Rohrai To Jatusana Under Op. S/Divn. Dhbvn, Palhawas During The Year 2025-2026. Shifting The Existing Ht/Lt...
11 Kv Ms V Bracket For 09 Mtrs Long Pcc Pole Made Of Ms Channel 75X40x6 Mm All Strength But Welded And Confirm As Per Specification Of Wbsedcl With Red Oxide Painting Procurement Of 11 Kv Ms V Bracket For 09 Mtrs Long Pcc Pole Under Purulia Division
Spl Repair Of Junction Box, Lt Cable, Light, Pcc Pole And Connected Items At Vsn, Spl Repair Of Ht Cable From Power House To 250 Kva Transformer, Provn Of Water Pressure Pump For Overhead Tanks And Provn Of Chemical Earthing
Installation Of Street Light On Existing Rcc/Pcc Pole From Beltala More To Sabuj Sangha Club Via Metro Club In Ward No 30 Within Booth No 162 Of 176 Uluberia Purba A.C. Under Apas 2025 Wbmad/Um/456/Apas/E-T/2025-26 Sl 11
Estimate For Replacement Of 12 No. 140 Kg.8mtr. Long Pcc Pole Of 11 Kv Line With Conductor And 2 No. 11 Kv Dp Strc. On 11 Mtr. H-beam Broken/damaged Due To Heavy Wind And Rain At Near Bakud River Under Sarni T Dc Under O And M Betul N Dn.
Safely Cartage Of Pcc Pole 8.5 Mtr. Long From Esc, Sre To The Site Of Work Including Loading Unloading At Both Ends. (dist. Up To 30 Km.) Safely Cartage Of Pcc Pole 11 Mtr. Long From Esc, Sre To The Site Of Work Including Loading Unloading At Both Ends. (dist. Up To 30 Km.) Safely Carriage Of Line Material Esc Sre To Site Of Works Through Privet Vehicle Including Loading And Unloading At Both Ends. (distance 0 To 30 K.m.) Safely Carriage Of 11 Kv Ct/pt Metering Combine Unit From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Metering Cubical 30/5 A From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Xlpe Cable 3x70 Sq.mm From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of Weasel Conductor From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of Rabbit Conductor From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Xlpe Cable 3x120 Sq.mm From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Fabrication And Erection Of Double Pole On Pcc Pole 8.5/11 Mtr. Long With Complete Fitting Of All Accessories Of 11kv/ Lt Line As Per Respo Specification. Erection Of Single Support On Pcc Pole Up To 11/8.5 Mtr Long With Complete Fitting Of All Accessories Of 11 Kv/lt As Per Respo Specification Providing And Fixing Of Gi Pipe 6” Dia Earthing Of Pole By Earthing Rod. Providing And Fixing Of Clamp With Nut & Bolt Concreting Of Pole Laying, Lifting, Stringing, Sagging Jumpring & Binding Of Acsr Weasel Conductor For 11 Kv/lt Line As Per Respo Specification Including Complete. Laying, Lifting, Stringing, Sagging Jumpring & Binding Of Acsr Rabbit Conductor For 11 Kv/lt Line As Per Respo Specification Including Complete. Providing And Fixing Of Stone Pad 300x300x75 Mm Providing And Fixing Of Danger Board With Clamp Providing And Fixing Of Barbed Wire Safely Installation Of 11 Kv Ct & Pt Metering Combine Unit 30x/5 A Safely Installation Of 11 Kv Metering Cubical 30/5 A Grouting And Fixing Of Stay Rods By Digging Of Pits In Block Of 600x600x300 Mm. & With New Brick And Nozzling Of Stay Wire 7/10 Swg And Fitting The Same On The Pole Concreing Of Stay Laying Of 11 Kv Xlpe Cable 3x70 Sq.mm Laying Of 11kv Xlpe Cable 3x120 Sq.mm For Line Crossing Making And Filling The 11 Kv Cable Jointing Kit Indoor/outdoor Type Size 3x70 Sqmm. Sq.mm As Per Respo Specification. Making And Filling The 11 Kv Cable Jointing Kit Indoor/outdoor Type 3x120 Sqmm. Sq.mm As Per Respo Specification. Fabrication Charge Of Channel And Angle
Construction Of Pcc Road From Electric Pole To Patla House At Uttar Basti Panjipara 117/G-I/Apas/Panjipara/01
Construction Of Pcc Road From Jora Pole Towards Bapi Mandi Via Kanjilal House At Patilpara Village Under Baidyapur Gp Id-Apas/01/264/31/0004
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted With Two Coat Of Cement Primer And Two Coat Of Final Paint Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted
Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Above Ground Level Are To Be Painted . Cleaning And Washing Of Pcc Poles And Rail Pole Structure And Other Iron Materials By Wire Brush To Make Them Smooth. All Pcc Poles And Foundation Plinth Are To Be Painted.