Urgent Replacement Of Components Of Radial Gate No. 3 And 8 Including Repair Of Stop Log Gate At Jawahar Sagar Dam
Maintenance And Repairing With Colouring Parapet Wall Of Waghur Dam And Colouring To Up Stream Side Radial Gates No 1 To 20 And Other Component Parts Waghur Dam And Oiling And Greasing To Radial Gate No 1 To 20 And Alied Works Of Waghur Dam
Concreting Work In The Eroded Areas Near The Roller Bucket Between Radial Gate No. 1 To 5 Of Hatnur Dam
Annual Repair Maintenance Work Of Radial Gate 7 Nos Head Sluice Gates And 2 Nos. Coupled Head Stock Set At Kushalpura Dam Medium Project Biaora, Distt Rajgarh M.p.
Pre-mansonon Electrical Repair Maintenance Of Radial Gate Control Panel Rest House And Illumination Arrangement At Crest Of Barna Dam Bari Year 2025-26
Urgent Replacement Of Components Of Radial Gate No. 3 And 8 Including Repair Of Stop Log Gate At Jawahar Sagar Dam
Oiling Greasing Of 8 No Radial Crest Gate 1 No Sluice Gate And 2 No Esacp Canal Gate And Pre- Mansoon Maintenance Of Chandora Dam Medium Irrigation Project In Wrd Division Multai Second Call Repair Work
Maintenance And Repairing With Colouring Parapet Wall Of Waghur Dam And Colouring To Up Stream Side Radial Gates No 1 To 20 And Other Component Parts Waghur Dam And Oiling And Greasing To Radial Gate No 1 To 20 And Alied Works Of Waghur Dam
Concreting Work In The Eroded Areas Near The Roller Bucket Between Radial Gate No. 1 To 5 Of Hatnur Dam
Replacement Of Steel Liner And Sill Beam Of Radial Gate No. 4 At Dulhasti Power Station Kishtwar