Construction Of Rob With 1x42 Mtr Composite Girder + 2x18 Mtr Composite Girder + 4x24.0 Mtr Rcc T- Beam Girder, Including Bridge Approaches With Re Walls In Lieu Of Existing Manned Lc- 447 At Km: 786/3-5 Between Sigadam- Cheepurupalli Stations Of Waltair Division In East Coast Railway
Construction Of Formation Cutting 5/7 Mtr. Wide, Dumping Sites, Retaining Walls, Breast Walls, Cross-drainage Work Km 0/0 To 2/510 And 19.75 Mtr Rcc Box Girder Bridge At Rd 0/975. Construction Of Lower Safru Grauru Link Road Gp Reur Km 0/0 To 2/510 Under Nabard Ridf-xxviii
Construction Of 1X20 Mtr Span Plate Girder Rcc Decked Bridge Over Maloori Nallah At Sarabagh Alongwith Road From Sarabagh To Dara Health Centre On Epc Mode Engineering Procurement And Construction Mode
Construction Of 1x15 Mtr Span Plate Girder Rcc Decked Bridge Over Maloori Nallah Gandtal Ganimohar Road On Epc Mode
Construction Work Of 30 Mtr Span R.c.c. P.s.c Girder Bridge At Km 1 Of Motor Road Up To Kalagaon On Danda Lakhound Road Of I.t. Park In Raipur Constituency Of Dehradun District Under State Sector.
C/O 76.67 Mtr. Span Rcc Box Girder Bridge Over Narad Khad On Bassi Sunhet Road G.P. Bara Km 0/0 To 11/600
Construction Of 76.67 Mtr Span Rcc Box Girder Bridge Over Narad Khad On Bassi Sunhet Road G.P Bara Km 0/0 To 11/600 Sh P/L Mastic Asphalt At Rd 7/450
Construction Of High Level Rcc Girder Bridge Over Kuchamucha Nala Between Sirum And Badidih Of Panchayat Landup In Khunti Of Khunti District
Construction Of High Level Rcc Girder Bridge Over Banai River Between Ghaghra To Hesal Near Karanjuvi Murhu Block Of Khunti District
Construction Of High Level Rcc Girder Bridge Over Sadgidih Ghat Between Connecting Bhursudih And Damari In Arki Block Of Khunti District