Providing And Laying 250Mm, 300Mm Dia. S.W. Pipe And 450Mm Dia Rcc Np-3 Pipe Sewer Line In D-Block, E-Block Dabua Colony Air Force 100Mtr. Area In Ward No.10, Nit Faridabad.
Estimate For Providing And Laying 450mm Dia. Rcc Np-3 Sewer Line At Phirni Road And From Phirni Road To Stp In Gaunchi Village In Ward No.01
Estimate For Providing And Laying 600Mm Dia. Rcc Np-3 Sewer Line And Making Connection Of Surrounding Streets Through 200Mm Dia. S. W. Sewer Line At Lal Kothi Road Sanjay Colony F Block In Ward No.06 Nit Faridabad.
Package Ii, Replacement Of Various Sizes Of Damaged Swp / Rcc, Strengthening Of Sewer Collection System In Various Sps Commanding Areas In Area Iv, V And Vi Under Vada Chennai Valarchi Thittam
Restoration Of Settled Deep Rcc Sewer Line Through Static Pipe Bursting Method From Near H. No. 51a To Near Yes Bank, Main Road, East Azad Nagar In Ward No. 214, In Ac-61, Gandhi Nagar Under Ee D-017.
Laying Of 450mm Dia Rcc Np3 Sewer Main Line From Budvel Railway Station To Banglore Highway Road To Connection Up Stream Outlet Of Venkateshwara Nagar, Sree Ram Colony, Budvel Railway Station To Avoid Chronic Over Flow And Stagnated Water In Low Laying Houses Under Katedan Section, Sub Division Ii, O And M Division Xvi, Rajendranagar
Waghodia Ugd Ii Under Sjmmsvy: Working Survey, Soil Investigation, Design Of Underground Drainage Project. Work Including Providing, Supplying, Lowering, Laying, Jointing, Testing And Commissioning Of Rcc Np3 Pipes For Sewer Collecting System - Gravity Mains And Di Pipes For Rising Main Pipeline, Construction Of Sewage Pumping Station Sps, Construction Of Sewage Treatment Plant, Supplying, Erecting, Testing & Commissioning Of Pumping Machineries At Zone Level, Construction Of Inspection Chambers & House Connection, Rcc Road, Compound Wall, Electrification Work And Sewer Cleaning Equipment Etc. For Underground Sewerage System For Waghodia Town Project, Work Including Operation And Maintenance Of 2 Years For Sewer Collecting System, And 7 Years For Sewage Treatment Plant
Construction Of Rcc Sewer Manholes And Associated Works In The Infrastructure Area Of Frfcf
Providing And Laying 250mm, Dia. S.w. Pipe And 450mm Dia Rcc Np-3 Pipe Sewer Line In Dabua Village Ward No.9
Providing And Laying Np-2 Rcc Pipe Sewer Line Back Side Of Staff Quarter No. C-117 And Additional 2 Numbers Manhole In Front Of C-08 To C-142 At Ajmal Bagh, Jamia Millia Islamia