Sh Con Of Thrust Anchor Blocks 100 Nos In The Rising Main In 1St Stage And 2Nd Stage Aug. Of Various Water Supply Scheme On The Left Bank Of Kurpan Khad In Nirmand Block Distt
Excavation Providing Laying Jointing And Testing Of Gmserw 250Mm Dia For Rising Main 1St Stage At Rd 0 To 775 Rmt Providing Lift Irrigation Scheme To Village Bhavran And Other Areas In Gp Amlehar From Beas River In Tehsil Nadaun District Hamirpur
Replacement Of Damaged Expansion Joints By New Ss Expansion Bellows And Arresting Online Heavy Water Leakages On 1050 Mm Dia Raw Water Rising Main.
Extension Of Clear Water Rising Main From Stadium To 7 Lakh Ltr Esr In Athagarh Nac.
Providing, Laying, Jointing, Testing And Carriage Of Ms Pipe Of 200 Mm Dia For Rising Main. Pdna No.-5057 Restoration Of Rain Damages To Lwss Rewalsar Town In Np Rewalsar In Tehsil Balh Distt. Mandi
Lines Prov. Grease, M.Oil, Gland Dori Etc., P/F. Union, Elbow, Tee, Wheel Valves And Welding Etc. The Time Schedule Shall Be As Directed By The Engineer-In-Charge Completed In All Respect R/M Of Lwss Ragyan Dudhli In Gp Pagog Tehsil Distt. Shimla Hp Sh- Providing Manpower For Supply Of Water For Different Localities By Operating Valves Etc. For Twelve12 Months Including Minor And Major Welding Of Rising Main, Distribution Lines P
. A/R M/O Lwss Tungish Bhaila In G.P. Cheog Tehsil Theog Distt. Shimla Hp.Sh-Providing Manpower For Operation /Watch Ward, Major, Minor Repair Of Pumping Machinery, Rising Main And Distribution Systems Etc. And Distribution/Supply Of Water For
Cad Works To Lis Purba Balota In Tehsil Palampur Distt. Kangra Hp Sh Laying, Jointing Of Rising Main Of 150Mm Dia At Adjoining Village For Lis Noura.
Providing Supply And Laying Of Rising Main Di 400mm K-9 Pipeline From Kohinoor To C- Type Esr At Na, Gidc
Designing And Construction Of Sewage Treatment Plant Of 1.00 To 1.30 Mld Along With All Allied Works, Designing, Providing, Supplying, Lowering, Laying & Join Ng Rising Main Network & Sewer Network, Supply, Installation, Testing And Commissioning Pumping Machineries And Allied Works, Three Month Trial Run For Surendranagar Underground Drainage Projec