Providing And Laying Of Rising Main 250 Mm I/D Main From Pataudi Chowk To Nts Booster In Ward 31 Zone 3 Under Mc Gurugram. Re-Call
Restoration Of Road From Valmiki Mandir, Kali Basti To Iti College Hastsal, Vikaspuri Road Being Dug Up By Djb For Laying Of 900mm Dia Rising Main In Ward No.107, Vikaspuri In West Zone. Ee/pr/wz/tc/2025-26/7
Cad Works To Lis Purba Balota In Tehsil Palampur Distt. Kangra Hp Sh Laying, Jointing Of Rising Main Of 150Mm Dia At Adjoining Village For Lis Noura.
Providing Supply And Laying Of Rising Main Di 400mm K-9 Pipeline From Kohinoor To C- Type Esr At Na, Gidc
Designing And Construction Of Sewage Treatment Plant Of 1.00 To 1.30 Mld Along With All Allied Works, Designing, Providing, Supplying, Lowering, Laying & Join Ng Rising Main Network & Sewer Network, Supply, Installation, Testing And Commissioning Pumping Machineries And Allied Works, Three Month Trial Run For Surendranagar Underground Drainage Projec
Work Of Laying The Main Rising Pipeline From Pump No. 3 Installed In The Municipality Campus To The Old Tank.
Sh Providing, Supplying And Erection Of Submersible Pump Set Along With Allied Accessories At Bore Well At Babeli, Laying, Jointing Testing Of Rising Main From Bore Well To Storage Tank 50 Mm Dia Restoration Of Rain Damages To Wss Babeli In Tehsil Distt. Kullu Hp.
Sh Providing, Supplying And Erection Of Submersible Pump Set Along With Allied Accessories At Bore Well Near Eye Hospital Raison, Laying, Jointing Testing Of Rising Main From Bore Well To Village Baga 65Mm Dia And, Laying, Jointing Testing Augmentation Of Wss Raison Malipather In Tehsil Distt. Kullu Hp.
Ballance Work In Piped Water Supply Scheme Under Jal Jeevan Mission At Village Eraya Block Bhitarwar Distt.gwalior Based On T.w.including Installation Of Electric Submersible Water Motor Pump, Laying And Jointing Of Rising Main, Feeder Main And Balance Work Jjm Eraya
Construction Of 25 Mld Stp In Rishi Nagar, 10 Mld Stp On Kaimari Road And Construction 4 No. Ips And Providing And Laying Of Rising Main From Ipss To Stps Including 3 Moths Trail Run Period, 1 Year Defect Liability And 5 Years O And M . Construction Of 25 Mld Stp ...