Rehabilitation Works Of Bridge At 5.20 Kmp Of Karimpur Shikarpur Road Under Nadia Division Bridge Rehabilitation Work
Cost. Of Nala And Rcc Slab Bharam Kumari Road To New Under Railway Bridge Ward No 16 Sunam
Provision Of S&t Work In C/w (i) Construction Of Road Under Bridge In Lieu Of Umlc-2, 3, 5, 6, 7 And 10 Without Covering Shed At These Level Crossings For Elimination In Mvj-ndt Section Over Ajmer Division Nwr And (ii) Construction Of Road Under Bridge In Lieu Of Umlc- 11, 12, 14 & 17 And Mlc-9 & 13 With Covering Shed At These Lcs For Elimination In Mvj-ndt Section Over Ajmer Division
Proposed Pipe Gutter Work At Kalavad Road Mahila Collage Under Bridge To Jankalayan Nala And Chirakutdham St No 1/a In Ward No 08
Construction Of Proposed Road Under Bridge In Lieu Of Lc No. 187 (vallayil Gate) At Rly Km 667/100-200 B/w Kozhikode And West Hill Stations Of Palakkad Division (7.50m Wide Carriageway (two Lane), 9.25m X 3.50m Rcc Box, Cast In Situ/box Pushing With Temporary Girders
Earth Filling From Majhi Para To Susunia Road Bridge Under Kalabani G.p
Proposed Collection Well With Pump Room In Road Under Bridge (rub)-10 Nos In Namakkal- Karur Section - Electrical Arrangements.
Proposed Collection Well With Pump Room In Road Under Bridge (rub)-15 Nos In Salem- Namakkal Section - Electrical Arrangement.
Proposed Construction Of Road Under Bridge(subway) In Lieu Of Lc No.110 At Km 215/3-5 Between Haq Yard Stations As 1x6.00x5.00m Rcc Box By Box Pushing Method.
Construction Organization: Secunderabad Division: Sanathnagar-moula Ali Bye- Pass Line Section. Proposed Construction Of "road Under Bridge" (br.no.44-a) Proposed Span As 2x9.00x5.00 M (min.5.0m Clear Ht) Rcc Boxes At Km. 15/1-2 In Lieu Of Existing Level Crossing No. Bp-8 Special Class (m) At Km.15/2-3 Between Ammuguda - Moula Ali Stations For Four Lane Carriage Way For Bridge Proper In Civil Engineering Portion.