Strenghthening Of Silo Chute By Supporting With H Beam At Silo Loading System Of Bocp Under Ba.
Labour Contract For Spray Channel Wall Weaken Portion Concrete Pillar And Tie Beam Supporting Work
Supply Of Brake Beam Liner With Two Supporting Screw For Bmbs Escorts As Per Rdso Drawing No. Wd-08093-s/2, Alteration-3, Item No. 1. Material & Specification As Per Drawing And Specificationrdso No. Wd-23-bmbs-2008rev.1 With Amendment-1 Of Sep-2016. Escorts Drawing No. 4eb 7354 As Per Drg.no. Escorts Drawing No. 4eb 7354 Wd-08093-s/2, Alt-3 Specn: Rdso Drawing No. Wd-08093-s/2, Alteration-3, Item No. 1. Material & Specification As Per Drawing And Specificationrdso No. Wd-23-bmbs-2008rev.1 With Amendment-1 Of Sep-2016. Escorts Drawing No. 4eb 7354.
Painting Of Supporting Beam/lifting Beam Over The Roof Of Manufacturing Block Inside Factory Area
Supply of Brake Beam Liner With Two Supporting Scr.
Gem bids for Repair, Maintenance, And Installation Of Plant/Systems/Equipments Version 2 - Coal Mines; Amc Formaintenance Of Throat Plate Supporting Beam Plough Feedertravelling Track Lip Angle Canopy And Jobs Of Passage Ofplough Feeder In Ground Bunker Tun.. /
Gem Bids For Repair Maintenance And Installation Of Plant Systemsequipments Version 2 - Coal Mines; Amc For Maintenance Of Throat Plate Supporting Beam Plough Feeder Travelling Track Lip Angle Canopy And Jobs Of Passage Of Plough Feeder In Ground Bunker Tun..
Procurement Of Fabricated Supporting Beam For Band Element For Drycon Conveyor 40 Nos
Supply Of Brake Beam Liner Along With Two Supporting Screws . 01 Set Will Consist Of Brake Beam Liner01 Nos And Supporting Screw Size-m8x1.25x1502 Nosthe Details Will Be As Per Enclosed Ann Exure, Drawing And Specification. Warranty Period: 36 Months After The Date Of Delivery
Supply of 70 Beam Supporting To Drawing No: 765-17-Cd236