Vadodara Division -: Replacement Of Cantilever Assembly And Traction Bonds In Anand - Godhra Section.
Augmentation/Reconditioning Of Earthing System Earth Pits In All Tss, Sp, Ssp, At, Stations & Robs And Replacement Of Existing Corroded/Rusted /Broken Traction Bonds & 70 Sqmm Cable In Virar-Jalgaon Section Of Mumbai Division
Replacement Of Damaged Traction Bonds At Various Station, Lc Gates, Bridges, Switching Sub-Stations Etc Over Malda Division Of Eastern Railway.
Supply Of Galvanized Steel Stranded Wire Traction Bonds With Logs Duly Crimped At Both Ends For 25kv Ac Traction System..
Disconnection & Re-Connection Of Various Types Of Traction Bonds During Different Types Of Engineering Machine Working Over Kharagpur Division For The Year 2025-26 Phase-Ii.
Replacement Of Corroded Traction Bonds With Gi Bonds Over Tvc Division.
Supply Of Galvanized Steel Stranded Wire Traction Bonds With Logs Duly Crimped At Both Ends For 25kv Ac Traction System..
Guntakal Division - I Disconnection And Reconnection Of Various Traction Bonds For Track Renewal Works, Including Ctrp - 5.962 Km, Trrp - 50.597 Km, And Tsrp - 0.52 Km, In The Kpd-tpty Section, Ii Disconnection And Reconnection Of Various Traction Bonds For Track Renewal Works, Including Tbr-103.865 Km, Tfr- 158.762 Km, And Ttrr-15 Sets In The Kpd-tpty, Ru-tpty, & Dmm-pak Sections And Iii Disconnection And Reconnection Of Various Traction Bonds For Track Renewal Works Ttr - 98 Sets, Ttrr - 25sets & Glued Joints - 52 Nos In The Gdr-ru & Ru- Gtl Sections Under The Jurisdiction Of Adee/trd/ru Sub-division.
Gtl Divn-1disconnection & Reconnection Of Various Traction Bonds For Track Renewal Works, Itbr-154.456 Km Iitbrp&c 117 Sets And Iii Tfr All Fittings 39.78 Km In The Gy-wadi, Klu-gtl & Bay-gtl 2 Disconnection & Reconnection Of Various Traction Bonds For Track Renewal Works Renewal Of Sejs-71 Sets & Renewal Of Glued Joints-444 No.s Sw-ii-ttrrails Of Existing 52kg/60kg Switches, Lead Rails, Crossings And Psc Sleepers On Running Lines With New 60kg Curved/thick Web Switches, Lead Rails, Cms/wcmsc And Turnout Sleepers For A Total Of 51 Sets. Fs+tws+wcmsc-7 Sets1 In 8½-2 Sets, 1in 12-4sets And 1 In -16 1set, Fs+tws+cmsc-29 Sets1in 8½-19 Sets, 1in 12-10sets, Fs+tws-1 In 8½-1set, Wcmsc-:1 In 12- 3 Sets, Ds-11 Sets In The Bay-gtl, Ru-gtl-wadi, Klu-gtl 3disconnection & Reconnection Of Various Traction Bonds For Track Renewal Works Ictrs Of Exg 52kg Rails On Psc Sleepers 1310/1540 Nos/km Density With 60kg Cl-i Rails Lwr On New Wider Psc Sleeperst-8746 1540 Nos/km Including Recoupment And Increasing Of Ballast Cushion To 250 Mm Along With Deep Screening Of Ballast For A Length Of 4.566 Kmsiitrrs Of Exg. 52kg Rails On Psc Sleepers M+7 Density With 60kgcl-i Rails Lwr For A Length Of 5.941 Kms.iii.tsr S With New Wider Base Sleepers T-8746 1540 Density Including Recoupment And Increasing Cushion To 250 Mm Along With Deep Screening Of Ballast For A Length Of 1.901 Kms. In The Dmm-gy, Dmm-pak & Kpd-tpty 4disconnection & Reconnection Of Various Traction Bonds For Track Renewal Works, Including Tbrbcm:69.56km Sw-ii: Through Ballasting Of Points And Crossing Along With Deep Screening For A Total No. Of 57sets. Sw-iii:tfr: Length Of 184.035 Km All Fittings-174.105km & Cgrsp-9.93kmsw-iv:ttr:cs:02, Cs+cmsc:03, Cmsc:01, S+tws:7, Tws+cmsc:14&wcmsc:4 In The Ru-gtlup&dn Ndl-dhne-gtlsl Gy-pdlsl Sections Under Adee/trd/gtl Sub-division.
Replacement Of Corroded And Damaged Electrical Traction Bonds In Trd-Tpj Jurisdiction- Phase-Ii