Supply, Installation, Testing, And Commissioning Of Indoor And Outdoor Telecom Equipment Along With Trenching, Laying, Jointing, And Termination Of Ofc & Six Quad Cables In Dhar-tirla-amjera-sardarpur Section, In Connection With Dahod- Indore New Bg Line Work Of Ratlam Division, Western Railway (m.p).
Execution Of In-campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In Odisha, West Bengal, Bihar And Jharkhand States For Last Mile Connectivity Of Airport Authority
Execution Of In-campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In Manipur, Tripura, Nagaland, Assam, Meghalaya, Mizoram And Arunachal Pradesh States For Last Mil
Annual Plan-133/26 Construction Of Mcf At Trenching Ground At Tirur Municipality
Road Retaring Proj No 139-25-26-Rt-Eachur Trenching Ground Pannyott Road Improvements In Munderi Gp
Relocation Of The Existing 400 Mm Dia Di K7 Distribution Pipe Line By Laying Of 400 Mm Dia Ms Pipe Along........with Land Slide At Belgachia Trenching Ground, Howrah. 04/ee/nd/w And S/kmda/2025-26
Construction Work At Trenching Ground Compost, Shed, Boundarywall Etc
Gem Bids For Layer 2 Access Switch V2 Q2, Wireless Access Point V2q2, Networking / Server Rack Q2, Small Form - Factorpluggable Transceiver Q2, Cat6 4pair Utp Cable 305mtr Inone Box, Cat6 4pair Utp Outdoor Cable 305mtr In One Box, Information Outlet Cat 6, Face Plate With Gang Box, 1meter Utp Cat 6 Patch Cord, 3 Meter Utp Cat 6patch Cord, 24 Port Cat6 Patch Panel Fully Loaded, Single Mode Fiber24 Core Armored Unitube, 12 Port Fibre Optic Liu Fullyloaded, 24 Port Fibre Optic Liu Fully Loaded, Fibre Patchcord Sc-lc Sm, Duplex 2 Meter, Online Ups 1 Kva Withminumum 15 Minutes Backup, Hdpe Pipe 40mm, 105x50mm Dlp Raceway With Accessories, 80x50mm Dlpraceway With Accessories, 32 Mm Pvc Heavy Conduit Withaccessories Isi Mark, 40 Mm Pvc Heavy Casing Withaccessories Isi Mark, Flexible Pipe 25 40 Mm, Laying Ofutp Cable In Raceway Conduit Casing Hdpe, Installationand Termination Of I O User Side Including I Opunching, Labelling And Testing, Installation Of Jack Panelincluding I O Punching, Labelling And Testing, Installation Offace Plate And Gang Box Including I O Punching, Labellingand Testing, Trenching For Outdoor Utp Cables As Perinstructions Including Digging, Laying Of Hdpe Pipes As Perlaying Instructions For Outdoor Utp Cables Including 32 40mm Hdpe Pipe, Laying Of Fibre Cable In Hdpe Pipes As Perlaying Instructions Including Hdr Drilling, Hdpe Pipe, Fibrepulling, Route Markers, Pits Etc., Digging The Concrete Androad Cutting, Supply And Installation 2 Inch Gi Pole For Theoutdoor Access Point, Installation Of Rack 32 15 9u, Installation Of Liu Including 26 Splicing, Installation Ofswitch, Installation Of Access Point, Onsite Networkengineer For 5 Year Support, Construction Of Huts As Perdesign Provided
Contractual Arrangement For Attending Any Type Of Electrical Fault Along With Routine Up Keeping Of Ht And Lt Electrical Network At Trenching Ground Ls And Dhankheti Khal Ls Under Grbu. Grbu/tr/el/25-26
Gem Bids For Integrated, Bid Number Gem2025b6674378 Dated 10-10-2025 Bid Document1 34 0 0 5Mp Bullet Camera With 30 Mtrs. Ir., 5Mp Outdoor Bulletcamera With 60Mtrs Ir., 4Mp Outdoor Bullet Camera With140mtrs Ir., 4Mp Outdoor Anpr Bullet Camera With140mtrs Ir., 4Mp Ir Ptz Camera With 30X Optical Zoom., 12Mp 4.3Mp Ir Multi-Sensor Camera With Ir Range 30Mtr., Video Management Software For 150 Camera Andupgradable Upto 1000 Camera, Nas San With Raid5 Andraid 6 Configurable Storage., Enterprise Grade Hard Disk, Sata-Iii, 18 Tb, 7200 Rpm, Video Management Operatorclient, Intel Core I7 Latest Generation, 32 Gb Ram, 8 Gbgraphics Card, Windows 11 Professional., Display 554Kuhd Display For 24 X 7 Operation, Ip Horn Speaker Foraudio Alarm Incase Of Any Unwanated Intrusion Or Videobased Analytical Alerts, Keyboard And Joystick Controller, Usb, Multi Backlit Keyboard, Workstation With Accessories, Industrial Ethernet, Managed Poe Switch With 4 Giga Poeports., 24 Port Poe Switch, Cat6 Sftp, 4Pair, 23Awg, Frpvc Cm, 305M Bundle, 6 Core Single Modearmoured Fiber Cable In Mtr., 24 Port Liu-Rack Mount Withaccessories, 1.5Mtr. Sc-Lc Single Mode Fibre Patch Chord, Ip66 Outdoor Custom Rack Pole Wall Mountable, 19 42Ustanding Rack With Glass Door, Fibre Junction Box With Allaccessories, 5 Kw Solar Power Plant With Battery Backup, 40Mm Hdpe Pipe In Mtr., Pvc Pipe 25Mm Mms In Mtr., Power Cable, 3 Core, 2.5 Sq.Mm In Mtr., Earthling, Gioctagonal Pole 10 Foot Height, Inside Angle, With Cameraplate, Gi Octagonal Pole 6 Metre Height With Camera Plate, Gi Octagonal Pole 9 Metre Height With Camera Plate Withearthling, 3Mtrs Iron Pole For Anpr Camera, Laying Ofhdpe Pipe On Wall Trench With Accessories In Mtr., Layingof Cable In Hdpe Pvc Pipe In Mtr., Hard Trenching For Cablein Mtr., Soft Trenching For Cable In Mtr., 3 Kw Solar Powerplant With Battery Backup, 1 Kva 800 Watt Mini Ups With100 Ah 3 Nos. Sfm Battery, Multi-Energy X-Ray Baggagescanner Tunnel Size Of 600 Mm W X 400 Mm., Accesstunnel For Multi-Energy X-Ray Baggage Scanner, Smartstreet Light 90 Watts, With Required Components Forcomplete Installations, Handheld Metal Detector, 4Th Yearcomprehensive Annual Maintenance Charges Camc After 3Year Warranty, 5Th Year Comprehensive Annualmaintenance Charges Camc After 3 Year Warranty