Gem Bids For Custom Bid For Services - Painting Of Poles Of 3point3kv Ohlgrass Uprooting In The 33kv Main Substation 3point3kv Chpsubstation And Colony Substation Yards And Painting Of 02nos 2point5mva Transformer And 01 No 3mva Transformerof Gondegaon Ocm A
System Improvement Work Related To Drawal Of Lt Ug Cable, Uprooting Of Existing Lt Ug Cable, Installation Of Sjb And Allied Works At Ah Block Under Jurisdiction Of Bidhannagar Customer Care Centre-Ii System Improvement Work At Ah Block
Gem Bids For Custom Bid For Services - R&M Of Garden Of Vip Guesthouse, Type Iv At Sector-F And Admin Building Garden, Ecopark Rambi Park At Sector C Including Cleaning, Uprooting, Providing Planting, Watering And Manuring Etc At Tld Iiipower Station, Rambi /
Estimate For The Cost Of Uprooting And Removal Of Heavy Weed Growth Of Lantana And Other Weeds In Kuravanthavalam And Cherukadavu Area Of Ambanar Forest Station In Pathanapuram Range During 2025-26
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-7 Adm Building, Aud, It, Fqa And Misc Area
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-4 Cooling Tower Stage-1
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-6 Switch Yard-solar Plant Ash Silo-ii
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-1 Cooling Tower Stage-ii
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-2 Central Store, Steel Yard, Rmcc
Jungle Cleaning And Uprooting, Including Disposal Of Waste To Locationas Per Direction Of Eic Inside Plant Area And Ganga Make-up Pump Housefor 21 Months 2025-27. Part-8 Cooling Tower Stage-2