Improvement Of Existing Irrigation Infrastructure Works On Vrb Cum Hr Cum Cr 8060m(26rd) On Amalsad Branch Canal
Restoration Of Existing Cr Cum V.r.b. At Ch. 27380 M (90.685-rd) Of Ubharat Branch Canal.
Constructing Rcc Box Type Barrel In Place Of Existing Damaged Vrb @ Ch.5200 Meter On Nadiad Dabhan Zarol Lateral Drain(davda Ramnagar Sim Vistar)
Constructing Of Box Vrb Ch.2000 Mt. And Ch.3600 Mt. In Place Of Existing Pipe Vrb On Manghroli To Shedhi River Drain Near Village Mohrel.
Reconstruction Of Pipe Vrb At Ch. 8.1 And 8.8 Km. Of Main Canal And Ch. 0.00, 2.00 And 2.5 Km. Of Minor D-1 And Ch. 0.50 Km. Of Minor D-7 Of Puna Irrigation Scheme Year 2025-26.
Construction Of V.r.b. At Hargarh Ist Pump Canal Site.
Repair Of Vrb At Km 0.150 Of Budhanpur Mr. In Distt. Moradabad For The Year 2025-26
Providing Railing To Vrb In Km 30, 31 And 33 Of Irbc, Repairs To Hpc In Km 33 Of Irbc Including Carrying Out Irrigation Management Work In Rabbi And Hot Weather Season 2025-26 Under U.P.I.Section No.07 Akhada Balapur
Repairs To Fall Cum Vrb Of Lm 15, Repairs To Fall Of Lm13 Of Nimgaon Branch Canal Including Carrying Out Irrigation Management Work In Rabbi And Hot Weather Season 2025-26 Under U.P.I.Section No.14 Ardhapur
Repairs To Fall In Km 7 On Vts Dy, Repairs To Vrb In Km 4 And Lining Work In Km 3, Related Work In Km 6 And 7 On Chabhara Dy Including Carrying Out Irrigation Management Work In Rabbi And Hot Weather Season 2025-26 Under U.P.I.Section No.15