Improvement Works To The Existing Of Flume Channel Running Between Marapalam Weir And Punachi Pick Up Weir By Providing Rcc For The Bottom Portion With Bed Slope Of 1 In 300 And Sides Of The Trapezoidal Channel With A Slope Of 1 In 1 From
Construction Of Weir Adjacent To Hl Bridge Over Local Nallah At 2.40 Km On Asanga To Kantasariguda Road In The District Of Nabarangpur For The Year 2024 25
Construction Of Lutmara Weir
Constructing Gravity Toe Wall For Erosion Control, River Retaining Work And Protection Work On D/s Of Hingani K.t. Weir On Right And Left Flank Of Godavari River, Tal Kopargaon, Dist A. Nagar
Repairs To Waste Weir Of Sondo Tank
Constructing Gravity Toe Wall For Erosion Control, River Retaining Work And Protection Work On D/s Of Dauch K.t. Weir On Right And Left Flank Of Godavari River, Tal Kopargaon, Dist A. Nagar.
Patalganga Indl. Area... M And R To Wss In Patalaganga Indl. Area... Strengthening Of Truninion Girders Embedmendments Of Godbole Gates At Patalganga Weir And Alllied Repairs Works.
Temporary Restoration To The Surplus Weir Of Armeni Kandriga Tank In Armeni Kandriga V In D.v Satram Mandal
Constructing Gabion Structure For Flood Protection Work At U/s Of Puntamba K.t.weir On Right Flank Of Godavari River, Tal Rahata, Dist A.nagar.
Constructing Gabion Structure For Flood Protection Work On U/s Of Shingave K.t.weir On Right Flank Of Godavari River, Tal Rahata, Dist A.nagar.