Supply of Partition Work, 54 Upvc Partitions Floor Space Cubicles Fabrication Work Electrification Of All Cubicles Wooden Table Vinyl Flooring
Supply of Special Training Furniture, 13 Customised Conference Table With Glass Top Customised Wooden Cabinets Customised High Back Chair Customised Wooden Partition Customised Wooden Cubicles Workstation Customised Conference Table Without Glass Top
Upgradation And Modification Of Ecdis Simulator, 261 Type-Approved Licensed Software For Ecdis Training Server-Cum-Instructor Station Software Student Station Software High Performance Pc 20 Inch Led Colour Monitors Projector Networking System Back Up Supply For The Computer Systems Ups Wooden Cubicles Executive Chairs Installation Testing And Commissioning Technical Documentation Training On Operational And Technical Aspects Of The Simulator
Construction Of Wooden Cubicles And Work Station Including Aluminium Partition At 4Th Floor Of Nagarayan Building, Salt Lake City Under Salt Lake Reclamation Sub-Division-I Of S.L. Reclamation Division. Wbudma/Ee/Slrd/Nit-19E/2022-23 Of Executive Engineer/Salt Lake Reclamation Division