Dredging In Front Of Repair Dock And Building Dock Mouth As Per The Dredging Plan To Lines/Levels/Slopes Using Cutter Suction Dredger Csd And Disposing Off And Dumping Materials Through Float Pipelines Approx. 100M. Depth 9.5M - 7.5M From Cd. Deployment Of Csd For Dredging Rd And Bd Mouth