Execution Of P.Way Zonal Works In The Section Between Parvatipuram In To Donkinavalasa In Stations Including Bobbili-Salur Section For The Period Upto 30.09.2026 Under Sr.Section Engineer P-Way/Bobbili, Under The Jurisdiction Of Assistant Divisional Engineer/Rayagada On Raipur -Vizianagaram Line Of Waltair Division.