Afeasibility Study And Detailed Project Report For Elimination Of Level Crossing With Road Over Bridge At Railway Crossing Of Katihar Division.49 L-Xing.B Feasibility Study And Detailed Project Report For Elimination Of Level Crossing With Road Over Bridge At Railway Crossing Of Katihar Division.51 L-Xing.