In This Estimate Provisions Included Are Earth Work Excavation, 136 Concrete For Side Wall, Lining, 9 Mm Plastering. General-Pvip Action Plan 2025-26- Rectification Of Pallikkara Md Between Ch0.150 Km And Ch 0.200 Km For The Year 2025- 26-General Civil Work